SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsLeominster
MA-260563

RONBOUCHARD KIA ABB STATION 2

488 Old Union Turnpike, Leominster, MA, 01453
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
RONBOUCHARD KIA ABB STATION 2 · DCFC CCS
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
1ACCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

488 Old Union Turnpike · Leominster, MA · 01453

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is RONBOUCHARD KIA ABB STATION 2 located?
RONBOUCHARD KIA ABB STATION 2 is located at 488 Old Union Turnpike, Leominster, MA.
What kind of charging does RONBOUCHARD KIA ABB STATION 2 offer?
RONBOUCHARD KIA ABB STATION 2 offers DC fast charging, with stations rated up to 50 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at RONBOUCHARD KIA ABB STATION 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at RONBOUCHARD KIA ABB STATION 2. Actual times vary with vehicle, temperature, and station load.
What are RONBOUCHARD KIA ABB STATION 2's charging hours?
Open 24 hours
What charging network operates RONBOUCHARD KIA ABB STATION 2?
RONBOUCHARD KIA ABB STATION 2 is part of the ChargePoint Network network. See more ChargePoint Network charging across MA on SpotCharge.
Can anyone use the chargers at RONBOUCHARD KIA ABB STATION 2?
Yes — RONBOUCHARD KIA ABB STATION 2 is a publicly accessible charging location.
Is the RONBOUCHARD KIA ABB STATION 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Leominster

See all →

MCKENZIE ENG STATION 1

Leominster, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

EV CHARGING NS1

Leominster, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

The Mall at Whitney Field - Tesla Supercharger

Leominster, MA

DC FastTesla
1 station · 8 ports50 kW

National Grid - Leominster

Leominster, MA

Level 2Non-Networked
1 station · 4 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging