SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsNew Bedford
MA-153685

School Public Facilities

265 Parker St, New Bedford, MA, 02740

School Public Facilities is a fleet garage in New Bedford, MA with 3 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last refreshed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fleet garage
📅Open since 2017
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
3
ports
Hours
—
Pricing
—

Stations & ports

1 station · 3 ports
School Public Facilities · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772
1CJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

265 Parker St · New Bedford, MA · 02740

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is School Public Facilities located?
School Public Facilities is located at 265 Parker St, New Bedford, MA.
What kind of charging does School Public Facilities offer?
School Public Facilities offers Level 2 (AC) charging. There is 1 charging station and 3 total ports at this location.
How long does it take to charge an EV at School Public Facilities?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at School Public Facilities. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at School Public Facilities?
School Public Facilities is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the School Public Facilities listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
15.8
9,064 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 9,064 publicly-listed ports in Massachusetts (6,590 Level 2 and 2,474 DC fast), that works out to roughly 15.8 EVs per public port and 36.8 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in New Bedford

See all →

Mechanics Cooperative Bank New Bedford

New Bedford, MA

DC FastRed E Charge
1 station · 2 ports120 kW

MBTA Church Street Station

New Bedford, MA

Level 2
1 station · 8 ports

MBTA New Bedford Station

New Bedford, MA

Level 2
1 station · 4 ports

St. Luke's Hawthorne St EV

New Bedford, MA

Level 2AmpUp
1 station · 10 ports6.1 kW
Details
Network
Non-networked
Access
By appointment
Workplace charging, mainly for employees · From NREL
Ownership
Privately owned
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id85844
zip02740
cityNew Bedford
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude41.64319
bd_blends—
longitude-70.94336
open_date2017-02-01
rd_blends—
ev_networkNon-Networked
ev_pricing—
unverifiedNo
updated_at2026-10-23T13:35:49Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSchool Public Facilities
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFLEET_GARAGE
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address265 Parker St
funding_sources—
owner_type_codeP
access_days_timeEmployee use only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num3
access_days_time_fr—
date_last_confirmed2024-10-11
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging