SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsBoston
MA-153642

City of Boston - V1 Parking Garage

302 Northern Ave, Boston, MA, 02210
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
15
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 15 ports
City of Boston - V1 Parking Garage · L2 J1772
NOODOE
AC L2 · 7.2 kW
Start session on NOODOE network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A
1MJ1772· 7.2 kW· 240V/30A
1NJ1772· 7.2 kW· 240V/30A
1OJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

302 Northern Ave · Boston, MA · 02210

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is City of Boston - V1 Parking Garage located?
City of Boston - V1 Parking Garage is located at 302 Northern Ave, Boston, MA.
What kind of charging does City of Boston - V1 Parking Garage offer?
City of Boston - V1 Parking Garage offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 15 total ports at this location.
How long does it take to charge an EV at City of Boston - V1 Parking Garage?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at City of Boston - V1 Parking Garage. Actual times vary with vehicle, temperature, and station load.
What are City of Boston - V1 Parking Garage's charging hours?
Open 24 hours
What charging network operates City of Boston - V1 Parking Garage?
City of Boston - V1 Parking Garage is part of the NOODOE network. See more NOODOE charging across MA on SpotCharge.
Can anyone use the chargers at City of Boston - V1 Parking Garage?
Yes — City of Boston - V1 Parking Garage is a publicly accessible charging location.
Is the City of Boston - V1 Parking Garage listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Boston

See all →

Fan Pier Garage Xeal Stations

Boston, MA

Level 2XEAL
1 station · 20 ports7.2 kW

CITY OF BOSTON MUNI LOT 15 #2

Boston, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

City of Boston - 12 Drydock (Garage)

Boston, MA

Level 2NOODOE
1 station · 11 ports7.2 kW

60 WESTERN AVE LAB BLDG 016

Boston, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-222-6618
Network
NOODOE ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging