SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsRaynham
MA-036424

Mastria Nissan

1305 New State Hwy, Raynham, MA, 02767
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🚗Car dealer
📅Open since 2012
🚚Fits Light-duty (cars, SUVs)
Max power
50 kW
DC fast
Ports
3
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 3 ports
Mastria Nissan · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
Mastria Nissan · DCFC CHAdeMO
Non-Networked
DC fast · 50 kW
2ACHAdeMO· 50 kW· 480V/100A
Mastria Nissan · DCFC CCS
Non-Networked
DC fast · 50 kW
3ACCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1305 New State Hwy · Raynham, MA · 02767

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Mastria Nissan located?
Mastria Nissan is located at 1305 New State Hwy, Raynham, MA.
What kind of charging does Mastria Nissan offer?
Mastria Nissan offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 3 total ports at this location.
How long does it take to charge an EV at Mastria Nissan?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Mastria Nissan. Actual times vary with vehicle, temperature, and station load.
What are Mastria Nissan's charging hours?
Open 24 hours
What charging network operates Mastria Nissan?
Mastria Nissan is part of the Non-Networked network. See more Non-Networked charging across MA on SpotCharge.
Can anyone use the chargers at Mastria Nissan?
Yes — Mastria Nissan is a publicly accessible charging location.
Is the Mastria Nissan listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Raynham

See all →

NOURIA RAYNHAM 1

Raynham, MA

DC FastChargePoint Network
2 stations · 2 ports50 kW

SWTCH Energy Inc.

Raynham, MA

Level 2SWTCH
1 station · 4 ports7.2 kW

ROUTE44 STATION 1

Raynham, MA

DC FastChargePoint Network
2 stations · 2 ports50 kW

Mastria Subaru

Raynham, MA

Level 2AMPUP
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-820-9028
Network
Non-Networked
Access
Public access · 📞 Call ahead for access

Verified by NREL · 5 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id45912
zip02767
cityRaynham
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude41.904048
bd_blends—
longitude-71.017224
open_date2012-01-31
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMastria Nissan
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeCAR_DEALER
nps_unit_name—
station_phone888-820-9028
cards_accepted—
ev_dc_fast_num1
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1305 New State Hwy
funding_sources—
owner_type_codeP
access_days_timeDealership business hours; contact 508-824-8614 for more information
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_codeCALL
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-01-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic - Call ahead
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic - Appeler à l'avance
intersection_directions_fr—
SpotCharge · Owner-listed EV charging