SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsGardner
MA-033296

Gardner Department of Public Works

50 Manca Dr, Gardner, MA, 01440
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏛️Government
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Gardner Department of Public Works · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

50 Manca Dr · Gardner, MA · 01440

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Gardner Department of Public Works located?
Gardner Department of Public Works is located at 50 Manca Dr, Gardner, MA.
What kind of charging does Gardner Department of Public Works offer?
Gardner Department of Public Works offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Gardner Department of Public Works?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Gardner Department of Public Works. Actual times vary with vehicle, temperature, and station load.
What are Gardner Department of Public Works's charging hours?
Open 24 hours
What charging network operates Gardner Department of Public Works?
Gardner Department of Public Works is part of the Non-Networked network. See more Non-Networked charging across MA on SpotCharge.
Can anyone use the chargers at Gardner Department of Public Works?
Yes — Gardner Department of Public Works is a publicly accessible charging location.
Is the Gardner Department of Public Works listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Gardner

See all →

Department of Correction North Central Correctional Institution

Gardner, MA

Level 2ChargePoint Network
1 station · 6 ports7.2 kW

Department of Conservation & Recreation Dunn State Park

Gardner, MA

Level 2Non-Networked
1 station · 1 port7.2 kW

SALVADORE AUTO SALVADORE L3 A

Gardner, MA

DC FastChargePoint Network
1 station · 2 ports50 kW

NOURIA GARDNER 1

Gardner, MA

DC FastChargePoint Network
1 station · 1 port50 kW
Details
Hours
Open 24 hours
Phone
978-630-8195
Network
Non-Networked
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging