SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsGardner
MA-033296

Gardner Department of Public Works

50 Manca Dr, Gardner, MA, 01440

Gardner Department of Public Works is a government in Gardner, MA with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. M-F 8am-4pm. Public access. Listing data from NREL, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏛️Government
📅Open since 2023
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
Hours
M-F 8am-4pm
Pricing
—

Stations & ports

1 station · 2 ports
Gardner Department of Public Works · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

50 Manca Dr · Gardner, MA · 01440

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Gardner Department of Public Works located?
Gardner Department of Public Works is located at 50 Manca Dr, Gardner, MA.
What kind of charging does Gardner Department of Public Works offer?
Gardner Department of Public Works offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Gardner Department of Public Works?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Gardner Department of Public Works. Actual times vary with vehicle, temperature, and station load.
What are Gardner Department of Public Works's charging hours?
M-F 8am-4pm
Can anyone use the chargers at Gardner Department of Public Works?
Yes — Gardner Department of Public Works is a publicly accessible charging location.
Is the Gardner Department of Public Works listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
16.1
8,919 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,919 publicly-listed ports in Massachusetts (6,521 Level 2 and 2,398 DC fast), that works out to roughly 16.1 EVs per public port and 38 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Gardner

See all →

Department of Correction North Central Correctional Institution

Gardner, MA

Level 2ChargePoint
1 station · 6 ports

Department of Conservation & Recreation Dunn State Park

Gardner, MA

Level 2
1 station · 1 port

SALVADORE AUTO SALVADORE L3 A

Gardner, MA

DC FastChargePoint
1 station · 2 ports400 kW

NOURIA GARDNER 1

Gardner, MA

DC FastChargePoint
1 station · 1 port319.2 kW
Details
Hours
M-F 8am-4pm
Phone
978-630-8195
Network
Non-networked
Access
Public access
Ownership
Local or municipal government
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id331147
zip01440
cityGardner
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude42.56202
bd_blends—
longitude-71.99696
open_date2023-06-15
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2025-02-12T00:16:32Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameGardner Department of Public Works
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeMUNI_GOV
nps_unit_name—
station_phone978-630-8195
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-8
hy_status_link—
street_address50 Manca Dr
funding_sources—
owner_type_codeLG
access_days_timeM-F 8am-4pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2024-04-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging