SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsKansasMatfield Green
KS-654102

KS Turnpike – Matfield Green

Milepost 97 Kansas Turnpike, Matfield Green, KS, 66862
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
6
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 6 ports
KS Turnpike – Matfield Green · DCFC CHAdeMO
FCN
DC fast · 50 kW
Start session on FCN network →
1ACHAdeMO· 50 kW· 480V/100A
1BCHAdeMO· 50 kW· 480V/100A
KS Turnpike – Matfield Green · L2 J1772
FCN
AC L2 · 7.2 kW
Start session on FCN network →
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A
KS Turnpike – Matfield Green · DCFC CCS
FCN
DC fast · 50 kW
Start session on FCN network →
3ACCS· 50 kW· 480V/100A
3BCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

Milepost 97 Kansas Turnpike · Matfield Green, KS · 66862

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is KS Turnpike – Matfield Green located?
KS Turnpike – Matfield Green is located at Milepost 97 Kansas Turnpike, Matfield Green, KS.
What kind of charging does KS Turnpike – Matfield Green offer?
KS Turnpike – Matfield Green offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 6 total ports at this location.
How long does it take to charge an EV at KS Turnpike – Matfield Green?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at KS Turnpike – Matfield Green. Actual times vary with vehicle, temperature, and station load.
What are KS Turnpike – Matfield Green's charging hours?
Open 24 hours
What charging network operates KS Turnpike – Matfield Green?
KS Turnpike – Matfield Green is part of the FCN network. See more FCN charging across KS on SpotCharge.
Can anyone use the chargers at KS Turnpike – Matfield Green?
Yes — KS Turnpike – Matfield Green is a publicly accessible charging location.
Is the KS Turnpike – Matfield Green listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Kansas · 2024
Plug-in vehicles
21K
#32 in US
Battery-electric
15K
69% of fleet
EVs per public port
17.7
1,191 ports listed

As of 2024, Kansas had 21,100 plug-in vehicles registered — 14,500 fully battery-electric (69%) and 6,600 plug-in hybrid (31%). That ranks Kansas #32 nationally and represents about 0.4% of all US plug-in registrations.

Across 1,191 publicly-listed ports in Kansas (624 Level 2 and 567 DC fast), that works out to roughly 17.7 EVs per public port and 25.6 BEVs per DC fast port.

Kansas has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Kansas drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Kansas market data →

More charging in Matfield Green

See all →

Love's 176-Matfield Green

Matfield Green, KS

DC FastFrancis Energy
2 stations · 4 ports350 kW
Details
Hours
Open 24 hours
Phone
800-489-1588
Network
FCN ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging