SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIndianaShelbyville
IN-460029

MAJOR HOSPITAL MAJOR HOSP 2

2120 Intelliplex Dr, Shelbyville, IN, 46176
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
MAJOR HOSPITAL MAJOR HOSP 2 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2120 Intelliplex Dr · Shelbyville, IN · 46176

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MAJOR HOSPITAL MAJOR HOSP 2 located?
MAJOR HOSPITAL MAJOR HOSP 2 is located at 2120 Intelliplex Dr, Shelbyville, IN.
What kind of charging does MAJOR HOSPITAL MAJOR HOSP 2 offer?
MAJOR HOSPITAL MAJOR HOSP 2 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at MAJOR HOSPITAL MAJOR HOSP 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at MAJOR HOSPITAL MAJOR HOSP 2. Actual times vary with vehicle, temperature, and station load.
What are MAJOR HOSPITAL MAJOR HOSP 2's charging hours?
Open 24 hours
What charging network operates MAJOR HOSPITAL MAJOR HOSP 2?
MAJOR HOSPITAL MAJOR HOSP 2 is part of the ChargePoint Network network. See more ChargePoint Network charging across IN on SpotCharge.
Can anyone use the chargers at MAJOR HOSPITAL MAJOR HOSP 2?
Yes — MAJOR HOSPITAL MAJOR HOSP 2 is a publicly accessible charging location.
Is the MAJOR HOSPITAL MAJOR HOSP 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Indiana · 2024
Plug-in vehicles
50K
#26 in US
Battery-electric
35K
69% of fleet
EVs per public port
20.5
2,434 ports listed

As of 2024, Indiana had 49,900 plug-in vehicles registered — 34,600 fully battery-electric (69%) and 15,300 plug-in hybrid (31%). That ranks Indiana #26 nationally and represents about 0.8% of all US plug-in registrations.

Across 2,434 publicly-listed ports in Indiana (1,041 Level 2 and 1,391 DC fast), that works out to roughly 20.5 EVs per public port and 24.9 BEVs per DC fast port.

Indiana's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Indiana market data →

More charging in Shelbyville

See all →

Hubler Ford Center

Shelbyville, IN

DC FastLevel 2Blink Network
2 stations · 5 ports50 kW

Sandman Bros

Shelbyville, IN

DC FastEV Connect
1 station · 1 port50 kW

Ivy-Tech, Shelbyville

Shelbyville, IN

Level 2Blink Network
1 station · 2 ports7.2 kW

Pilot Travel Center #242 Shelbyville, IN

Shelbyville, IN

DC FasteVgo Network
1 station · 4 ports350 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging