SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIndianaScottsburg
IN-459325

Scott County Redevelopment - Scott County Train Depot

90 N Main St, Scottsburg, IN, 47170

Scott County Redevelopment - Scott County Train Depot is an EV charging location in Scottsburg, IN with 2 Level 2 charging ports up to 19 kW on the FLO network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
Scott County Redevelopment - Scott County Train Depot · L2 J1772 19.2 kW
FLO
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on FLO network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

90 N Main St · Scottsburg, IN · 47170

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Scott County Redevelopment - Scott County Train Depot located?
Scott County Redevelopment - Scott County Train Depot is located at 90 N Main St, Scottsburg, IN.
What kind of charging does Scott County Redevelopment - Scott County Train Depot offer?
Scott County Redevelopment - Scott County Train Depot offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Scott County Redevelopment - Scott County Train Depot?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Scott County Redevelopment - Scott County Train Depot. Actual times vary with vehicle, temperature, and station load.
What are Scott County Redevelopment - Scott County Train Depot's charging hours?
24 hours daily
What charging network operates Scott County Redevelopment - Scott County Train Depot?
Scott County Redevelopment - Scott County Train Depot is part of the FLO network. See more FLO charging across IN on SpotCharge.
Can anyone use the chargers at Scott County Redevelopment - Scott County Train Depot?
Yes — Scott County Redevelopment - Scott County Train Depot is a publicly accessible charging location.
Is the Scott County Redevelopment - Scott County Train Depot listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Indiana · 2024
Plug-in vehicles
50K
#26 in US
Battery-electric
35K
69% of fleet
EVs per public port
18.7
2,671 ports listed

As of 2024, Indiana had 49,900 plug-in vehicles registered — 34,600 fully battery-electric (69%) and 15,300 plug-in hybrid (31%). That ranks Indiana #26 nationally and represents about 0.8% of all US plug-in registrations.

Across 2,671 publicly-listed ports in Indiana (1,174 Level 2 and 1,495 DC fast), that works out to roughly 18.7 EVs per public port and 23.1 BEVs per DC fast port.

Indiana has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Indiana drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Indiana market data →

More charging in Scottsburg

See all →

Hampton Inn & Suites Scottsburg IN 47170

Scottsburg, IN

Level 2Vialynk
1 station · 2 ports19.2 kW

Holiday Inn Scottsburg

Scottsburg, IN

Level 2Vialynk
1 station · 2 ports10 kW

Scott County Redevelopment - Scott County Courthouse Square

Scottsburg, IN

Level 2FLO
1 station · 2 ports19.2 kW

John Jones Chev Buick of Scottsburg

Scottsburg, IN

DC FastEV Connect
1 station · 1 port50 kW
Details
Hours
24 hours daily
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id389932
zip47170
cityScottsburg
plus4—
stateIN
ng_psi—
cng_psi—
countryUS
latitude38.686778
bd_blends—
longitude-85.770806
open_date2025-04-15
rd_blends—
ev_networkFLO
ev_pricing—
updated_at2026-09-19T02:53:41Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameScott County Redevelopment - Scott County Train Depot
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-356-8911
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "8529ffc9-3770-492e-8688-3e08d4d1f0af",
    "9591d0e4-764d-41d2-9c8c-912b7ad5d881"
  ],
  "station": [
    "f82ac940-c3c1-4686-849b-d070b8d8d888"
  ]
}
ev_network_webhttps://www.flo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address90 N Main St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging