SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisWheaton
IL-962431

DUPAGE CO DUPAGE ADMIN 1

421 N County Farm Rd, Wheaton, IL, 60187

DUPAGE CO DUPAGE ADMIN 1 is an EV charging location in Wheaton, IL with 2 Level 2 charging ports up to 13 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
12.7 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • South Parking Lot of 421 Building

    Source · NREL

Stations & ports

1 station · 2 ports
DUPAGE CO DUPAGE ADMIN 1 · L2 J1772 12.7 kW
ChargePoint Network
AC L2 · 12.7 kW

12.7 kW adds roughly 45 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 12.7 kW
1BJ1772· 12.7 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

421 N County Farm Rd · Wheaton, IL · 60187

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DUPAGE CO DUPAGE ADMIN 1 located?
DUPAGE CO DUPAGE ADMIN 1 is located at 421 N County Farm Rd, Wheaton, IL.
What kind of charging does DUPAGE CO DUPAGE ADMIN 1 offer?
DUPAGE CO DUPAGE ADMIN 1 offers Level 2 (AC) charging, with stations rated up to 12.7 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at DUPAGE CO DUPAGE ADMIN 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at DUPAGE CO DUPAGE ADMIN 1. Actual times vary with vehicle, temperature, and station load.
What are DUPAGE CO DUPAGE ADMIN 1's charging hours?
24 hours daily
What charging network operates DUPAGE CO DUPAGE ADMIN 1?
DUPAGE CO DUPAGE ADMIN 1 is part of the ChargePoint network. See more ChargePoint charging across IL on SpotCharge.
Can anyone use the chargers at DUPAGE CO DUPAGE ADMIN 1?
Yes — DUPAGE CO DUPAGE ADMIN 1 is a publicly accessible charging location.
Is the DUPAGE CO DUPAGE ADMIN 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
26.6
6,237 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 6,237 publicly-listed ports in Illinois (2,776 Level 2 and 3,459 DC fast), that works out to roughly 26.6 EVs per public port and 36.3 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More charging in Wheaton

See all →

Edman Memorial Chapel - Wheaton College, IL - Tesla Destination

Wheaton, IL

Level 2Tesla Destination
2 stations · 8 ports11 kW

Wheaton Park District Community Center - Tesla Destination

Wheaton, IL

Level 2Tesla Destination
2 stations · 8 ports7 kW

DUPAGE CO DUPAGE CARE 1

Wheaton, IL

DC FastChargePoint
2 stations · 2 ports62.5 kW

DUPAGE CO DUPAGE CARE 2

Wheaton, IL

Level 2ChargePoint
2 stations · 4 ports11.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id446969
zip60187
cityWheaton
plus4—
stateIL
ng_psi—
cng_psi—
countryUS
latitude41.867013
bd_blends—
longitude-88.141328
open_date2025-12-07
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:05:30Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameDUPAGE CO DUPAGE ADMIN 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "28332331",
    "28332341"
  ],
  "station": [
    "USCPIL18252161"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address421 N County Farm Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 12.7,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 12.7,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsSouth Parking Lot of 421 Building
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging