SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisUrbana
IL-787791

Eastland Apartments

1905 N Cunningham Ave, Urbana, IL, 61802

Eastland Apartments is a multi-unit residence in Urbana, IL with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Contact stations for hours of operation. Public access. Listing data from NREL, last confirmed September 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Multi-unit residence
📅Open since 2024
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
Hours
Contact stations for hours of operation
Pricing
—

Stations & ports

1 station · 2 ports
Eastland Apartments · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1905 N Cunningham Ave · Urbana, IL · 61802

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Eastland Apartments located?
Eastland Apartments is located at 1905 N Cunningham Ave, Urbana, IL.
What kind of charging does Eastland Apartments offer?
Eastland Apartments offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Eastland Apartments?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Eastland Apartments. Actual times vary with vehicle, temperature, and station load.
What are Eastland Apartments's charging hours?
Contact stations for hours of operation
What charging network operates Eastland Apartments?
Eastland Apartments is part of the AmpUp network. See more AmpUp charging across IL on SpotCharge.
Can anyone use the chargers at Eastland Apartments?
Yes — Eastland Apartments is a publicly accessible charging location.
How do you pay for charging at Eastland Apartments?
Eastland Apartments accepts Mastercard, American Express, Discover, Apple Pay and Google Pay, according to NREL.
Is the Eastland Apartments listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
26.6
6,237 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 6,237 publicly-listed ports in Illinois (2,776 Level 2 and 3,459 DC fast), that works out to roughly 26.6 EVs per public port and 36.3 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More charging in Urbana

See all →

Hotel Royer Tapestry Collection by Hilton - Tesla Destination

Urbana, IL

Level 2Tesla Destination
2 stations · 4 ports

Rodeway Inn Urbana Champaign University Area

Urbana, IL

DC FastUniversal EV Chargers
1 station · 4 ports90 kW

KIA OF URBANA WELCOME CENTER

Urbana, IL

DC FastChargePoint
2 stations · 2 ports50 kW

ILLINI CHARGING D22-ALUMNI CTR

Urbana, IL

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
Contact stations for hours of operation
Phone
217-649-8115
Network
AmpUp ↗
Access
Public access
Payment
Mastercard, American Express, Discover, Apple Pay, Google Pay
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 12 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id421527
zip61802
cityUrbana
plus4—
stateIL
ng_psi—
cng_psi—
countryUS
latitude40.1307564
bd_blends—
longitude-88.198334
open_date2024-05-16
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2026-08-05T18:21:35Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEastland Apartments
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeMULTI_UNIT_DWELLING
nps_unit_name—
station_phone217-649-8115
cards_acceptedA ANDROID_PAY APPLE_PAY CREDIT D M
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1905 N Cunningham Ave
funding_sources—
owner_type_codeP
access_days_timeContact stations for hours of operation
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-09-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging