SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisNormal
IL-317992

Heartland Community College - Agriculture Complex

1608 W Raab Rd, Normal, IL, 61761

Heartland Community College - Agriculture Complex is a college campus in Normal, IL with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: 0.35 kWh. College business hours. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍College campus
📅Open since 2024
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
Hours
College business hours
Pricing
0.35 kWh
0.35 kWh

Finding this location

  • Located at West Entry

    Source · NREL

Stations & ports

1 station · 2 ports
Heartland Community College - Agriculture Complex · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1608 W Raab Rd · Normal, IL · 61761

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Heartland Community College - Agriculture Complex located?
Heartland Community College - Agriculture Complex is located at 1608 W Raab Rd, Normal, IL.
What kind of charging does Heartland Community College - Agriculture Complex offer?
Heartland Community College - Agriculture Complex offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Heartland Community College - Agriculture Complex?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Heartland Community College - Agriculture Complex. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Heartland Community College - Agriculture Complex?
0.35 kWh
What are Heartland Community College - Agriculture Complex's charging hours?
College business hours
Can anyone use the chargers at Heartland Community College - Agriculture Complex?
Yes — Heartland Community College - Agriculture Complex is a publicly accessible charging location.
Is the Heartland Community College - Agriculture Complex listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
26.6
6,239 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 6,239 publicly-listed ports in Illinois (2,776 Level 2 and 3,461 DC fast), that works out to roughly 26.6 EVs per public port and 36.3 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More charging in Normal

See all →

Clarion Pointe Bloomington

Normal, IL

DC FastUniversal EV Chargers
1 station · 4 ports90 kW

Normal, IL - Tesla Supercharger

Normal, IL

DC FastTesla
1 station · 8 ports150 kW

OBE MARRIOTT NORMAL

Normal, IL

Level 2ChargePoint
1 station · 2 ports6.5 kW

ISU BONE PAYLOT BPL WEST

Normal, IL

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
College business hours
Pricing
0.35 kWh
Phone
309-268-8000
Network
Non-networked
Access
Public access
Ownership
Local or municipal government
From NREL

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id353925
zip61761
cityNormal
plus4—
stateIL
ng_psi—
cng_psi—
countryUS
latitude40.532059
bd_blends—
longitude-89.019026
open_date2024-08-01
rd_blends—
ev_networkNon-Networked
ev_pricing0.35 kWh
updated_at2026-09-14T19:35:57Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameHeartland Community College - Agriculture Complex
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeCOLLEGE_CAMPUS
nps_unit_name—
station_phone309-268-8000
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1608 W Raab Rd
funding_sources—
owner_type_codeLG
access_days_timeCollege business hours
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsLocated at West Entry
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging