SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisGurnee
IL-311798

GCDJ POWER LINK 1

7255 Grand Ave, Gurnee, IL, 60031

GCDJ POWER LINK 1 is an EV charging location in Gurnee, IL with 2 DC fast charging ports up to 200 kW on the ChargePoint network. Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
200 kW
DC fast
Ports
2
ports
Hours
Hours
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm
Pricing
—

Stations & ports

1 station · 2 ports
GCDJ POWER LINK 1 · DCFC CCS 200 kW
ChargePoint Network
DC fast · 200 kW

200 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 200 kW
1BCCS· 200 kW

Estimated charging time

DC fast charging · 200 kW
~18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7255 Grand Ave · Gurnee, IL · 60031

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is GCDJ POWER LINK 1 located?
GCDJ POWER LINK 1 is located at 7255 Grand Ave, Gurnee, IL.
What kind of charging does GCDJ POWER LINK 1 offer?
GCDJ POWER LINK 1 offers DC fast charging, with stations rated up to 200 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at GCDJ POWER LINK 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 18 min on 200 kW DC fast charging at GCDJ POWER LINK 1. Actual times vary with vehicle, temperature, and station load.
What are GCDJ POWER LINK 1's charging hours?
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm
What charging network operates GCDJ POWER LINK 1?
GCDJ POWER LINK 1 is part of the ChargePoint network. See more ChargePoint charging across IL on SpotCharge.
Can anyone use the chargers at GCDJ POWER LINK 1?
Yes — GCDJ POWER LINK 1 is a publicly accessible charging location.
Is the GCDJ POWER LINK 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
26.6
6,237 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 6,237 publicly-listed ports in Illinois (2,776 Level 2 and 3,459 DC fast), that works out to roughly 26.6 EVs per public port and 36.3 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More DC fast charging

DC fast charging in Gurnee →DC fast charging in Illinois →ChargePoint in Illinois →

More charging in Gurnee

See all →

Muller Honda of Gurnee - Series DCFC

Gurnee, IL

DC FastBlink
1 station · 3 ports40 kW

BP Gurnee

Gurnee, IL

DC FastNayax Energy
1 station · 6 ports240 kW

GCDJ GURNEE CP6000

Gurnee, IL

Level 2ChargePoint
1 station · 2 ports19.2 kW

GCDJ GURNEE CPF50-1

Gurnee, IL

Level 2ChargePoint
1 station · 1 port12 kW
Details
Hours
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id374027
zip60031
cityGurnee
plus4—
stateIL
ng_psi—
cng_psi—
countryUS
latitude42.385002
bd_blends—
longitude-87.983667
open_date2024-12-18
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:52:59Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameGCDJ POWER LINK 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "26602361",
    "26602371"
  ],
  "station": [
    "USCPIL16793101"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address7255 Grand Ave
funding_sources—
owner_type_code—
access_days_timeMon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 200,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 200,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging