SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisGreat Lakes
IL-270454

Naval Station Great Lakes

1506 Spaulding St, Great Lakes, IL, 60088
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Mil base
Max power
7.2 kW
AC Level 2
Ports
31
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 31 ports
Naval Station Great Lakes · L1 J1772
Non-Networked
AC L2 · 1.4 kW
1AJ1772· 1.4 kW· 120V/12A
1BJ1772· 1.4 kW· 120V/12A
1CJ1772· 1.4 kW· 120V/12A
1DJ1772· 1.4 kW· 120V/12A
1EJ1772· 1.4 kW· 120V/12A
1FJ1772· 1.4 kW· 120V/12A
1GJ1772· 1.4 kW· 120V/12A
1HJ1772· 1.4 kW· 120V/12A
1IJ1772· 1.4 kW· 120V/12A
1JJ1772· 1.4 kW· 120V/12A
1KJ1772· 1.4 kW· 120V/12A
1LJ1772· 1.4 kW· 120V/12A
1MJ1772· 1.4 kW· 120V/12A
1NJ1772· 1.4 kW· 120V/12A
1OJ1772· 1.4 kW· 120V/12A
1PJ1772· 1.4 kW· 120V/12A
1QJ1772· 1.4 kW· 120V/12A
1RJ1772· 1.4 kW· 120V/12A
1SJ1772· 1.4 kW· 120V/12A
1TJ1772· 1.4 kW· 120V/12A
1UJ1772· 1.4 kW· 120V/12A
1VJ1772· 1.4 kW· 120V/12A
1WJ1772· 1.4 kW· 120V/12A
Naval Station Great Lakes · L2 J1772
Non-Networked
AC L2 · 7.2 kW
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A
2CJ1772· 7.2 kW· 240V/30A
2DJ1772· 7.2 kW· 240V/30A
2EJ1772· 7.2 kW· 240V/30A
2FJ1772· 7.2 kW· 240V/30A
2GJ1772· 7.2 kW· 240V/30A
2HJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1506 Spaulding St · Great Lakes, IL · 60088

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Naval Station Great Lakes located?
Naval Station Great Lakes is located at 1506 Spaulding St, Great Lakes, IL.
What kind of charging does Naval Station Great Lakes offer?
Naval Station Great Lakes offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There are 2 charging stations and 31 total ports at this location.
How long does it take to charge an EV at Naval Station Great Lakes?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Naval Station Great Lakes. Actual times vary with vehicle, temperature, and station load.
What are Naval Station Great Lakes's charging hours?
Open 24 hours
What charging network operates Naval Station Great Lakes?
Naval Station Great Lakes is part of the Non-Networked network. See more Non-Networked charging across IL on SpotCharge.
Can anyone use the chargers at Naval Station Great Lakes?
Naval Station Great Lakes is listed as by appointment access — check the details before visiting.
Is the Naval Station Great Lakes listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
30.8
5,382 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 5,382 publicly-listed ports in Illinois (2,377 Level 2 and 3,003 DC fast), that works out to roughly 30.8 EVs per public port and 41.8 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More charging in Great Lakes

See all →

FEC MIDLANT / N00128-B1506-1A

Great Lakes, IL

Level 2Non-Networked
1 station · 2 ports7.2 kW

NAVSTA Great Lakes / N00128-B68-1,2,3,4,5

Great Lakes, IL

Level 2Non-Networked
1 station · 10 ports7.2 kW

NAVSTA Great Lakes / N00128-B3-1,2,3,4

Great Lakes, IL

Level 2Non-Networked
1 station · 8 ports7.2 kW

NAVSTA Great Lakes / N00128-B1H-1,2,3,4

Great Lakes, IL

Level 2Non-Networked
1 station · 8 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging