SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIllinoisDanville
IL-216650

VISN 12 DANVILLE VAMC

1901 E Main St, Danville, IL, 61834

VISN 12 DANVILLE VAMC is a fed gov in Danville, IL with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: $0.13 per kWh. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2021
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
$0.13 per kWh
$0.13 per kWh

Stations & ports

1 station · 1 port
VISN 12 DANVILLE VAMC · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1901 E Main St · Danville, IL · 61834

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is VISN 12 DANVILLE VAMC located?
VISN 12 DANVILLE VAMC is located at 1901 E Main St, Danville, IL.
What kind of charging does VISN 12 DANVILLE VAMC offer?
VISN 12 DANVILLE VAMC offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at VISN 12 DANVILLE VAMC?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at VISN 12 DANVILLE VAMC. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at VISN 12 DANVILLE VAMC?
$0.13 per kWh
Can anyone use the chargers at VISN 12 DANVILLE VAMC?
VISN 12 DANVILLE VAMC is listed as by appointment access (Government use only) — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the VISN 12 DANVILLE VAMC listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Illinois · 2024
Plug-in vehicles
166K
#8 in US
Battery-electric
126K
76% of fleet
EVs per public port
26.6
6,239 ports listed

As of 2024, Illinois had 165,900 plug-in vehicles registered — 125,500 fully battery-electric (76%) and 40,400 plug-in hybrid (24%). That ranks Illinois #8 nationally and represents about 2.8% of all US plug-in registrations.

Across 6,239 publicly-listed ports in Illinois (2,776 Level 2 and 3,461 DC fast), that works out to roughly 26.6 EVs per public port and 36.3 BEVs per DC fast port.

Illinois's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Illinois market data →

More charging in Danville

See all →

Holiday Inn Express Danville, an IHG Hotel - Tesla Destination

Danville, IL

Level 2Tesla Destination
2 stations · 4 ports

CARLE FOUNDATIO ATR ASC 4

Danville, IL

Level 2ChargePoint
1 station · 2 ports6.5 kW

TownePlace Suites by Marriott Danville - Tesla Destination

Danville, IL

Level 2Tesla Destination
2 stations · 8 ports10 kW

CARLE FOUNDATIO CATR ASC 3

Danville, IL

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Pricing
$0.13 per kWh
Network
Non-networked
Access
By appointment · Government use only
Workplace charging, mainly for employees · From NREL
Ownership
Federal government
From NREL

Verified by NREL · 9 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id184317
zip61834
cityDanville
plus4—
stateIL
ng_psi—
cng_psi—
countryUS
latitude40.131943
bd_blends—
longitude-87.592265
open_date2021-01-15
rd_blends—
ev_networkNon-Networked
ev_pricing$0.13 per kWh
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameVISN 12 DANVILLE VAMC
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 19,
  "code": "VA",
  "name": "Department of Veterans Affairs"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1901 E Main St
funding_sources—
owner_type_codeFG
access_days_timeAccepts fleet card
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging