SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIowaCedar Rapids
IA-796960

Indian Creek Nature Center

5300 Otis Rd SE, Cedar Rapids, IA, 52403

Indian Creek Nature Center is an EV charging location in Cedar Rapids, IA with 2 DC fast charging ports up to 60 kW on the ChargeLab network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
60 kW
DC fast
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

2 stations · 2 ports
Indian Creek Nature Center · DCFC CCS 60 kW
CHARGELAB
DC fast · 60 kW

60 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on CHARGELAB network →
1ACCS· 60 kW
Indian Creek Nature Center · DCFC CHAdeMO 60 kW
CHARGELAB
DC fast · 60 kW

60 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on CHARGELAB network →
2ACHAdeMO· 60 kW

Estimated charging time

DC fast charging · 60 kW
~58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5300 Otis Rd SE · Cedar Rapids, IA · 52403

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Indian Creek Nature Center located?
Indian Creek Nature Center is located at 5300 Otis Rd SE, Cedar Rapids, IA.
What kind of charging does Indian Creek Nature Center offer?
Indian Creek Nature Center offers DC fast charging, with stations rated up to 60 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Indian Creek Nature Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 58 min on 60 kW DC fast charging at Indian Creek Nature Center. Actual times vary with vehicle, temperature, and station load.
What charging network operates Indian Creek Nature Center?
Indian Creek Nature Center is part of the ChargeLab network. See more ChargeLab charging across IA on SpotCharge.
Can anyone use the chargers at Indian Creek Nature Center?
Yes — Indian Creek Nature Center is a publicly accessible charging location.
Is the Indian Creek Nature Center listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Iowa · 2024
Plug-in vehicles
19K
#34 in US
Battery-electric
12K
62% of fleet
EVs per public port
6.5
2,941 ports listed

As of 2024, Iowa had 19,000 plug-in vehicles registered — 11,700 fully battery-electric (62%) and 7,300 plug-in hybrid (38%). That ranks Iowa #34 nationally and represents about 0.3% of all US plug-in registrations.

Across 2,941 publicly-listed ports in Iowa (2,010 Level 2 and 920 DC fast), that works out to roughly 6.5 EVs per public port and 12.7 BEVs per DC fast port.

Iowa has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Iowa drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Iowa market data →

More DC fast charging

DC fast charging in Cedar Rapids →DC fast charging in Iowa →ChargeLab in Iowa →

More charging in Cedar Rapids

See all →

Tesla Supercharger

Cedar Rapids, IA

DC FastTesla
1 station · 8 ports250 kW

PARK CR 1

Cedar Rapids, IA

Level 2ChargePoint
1 station · 1 port13.4 kW

Tru by Hilton Cedar Rapids Westdale

Cedar Rapids, IA

Level 2TurnOnGreen
1 station · 4 ports11 kW

The Meth-Wick Community

Cedar Rapids, IA

Level 2evGateway
1 station · 2 ports9.6 kW
Details
Phone
800-636-0986
Network
ChargeLab ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id331667
zip52403
cityCedar Rapids
plus4—
stateIA
ng_psi—
cng_psi—
countryUS
latitude41.96742
bd_blends—
longitude-91.588295
open_date2024-04-04
rd_blends—
ev_networkCHARGELAB
ev_pricing—
updated_at2026-09-18T06:19:58Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameIndian Creek Nature Center
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone800-636-0986
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "29e0c361-297a-4779-8e8a-17cf82ac5ef4**1",
    "29e0c361-297a-4779-8e8a-17cf82ac5ef4**2"
  ],
  "station": [
    "125-6816921eed9411bac3abbd77"
  ]
}
ev_network_webhttps://chargelab.co
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address5300 Otis Rd SE
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 60,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 60,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging