SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsIowaMuscatine
IA-709445

Muscatine Power and Water

3205 Cedar Street, Muscatine, IA, 52761
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2020
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Muscatine Power and Water · L2 J1772
EV Connect
AC L2 · 7.2 kW
Start session on EV Connect network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3205 Cedar Street · Muscatine, IA · 52761

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Muscatine Power and Water located?
Muscatine Power and Water is located at 3205 Cedar Street, Muscatine, IA.
What kind of charging does Muscatine Power and Water offer?
Muscatine Power and Water offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Muscatine Power and Water?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Muscatine Power and Water. Actual times vary with vehicle, temperature, and station load.
What are Muscatine Power and Water's charging hours?
Open 24 hours
What charging network operates Muscatine Power and Water?
Muscatine Power and Water is part of the EV Connect network. See more EV Connect charging across IA on SpotCharge.
Can anyone use the chargers at Muscatine Power and Water?
Yes — Muscatine Power and Water is a publicly accessible charging location.
Is the Muscatine Power and Water listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Iowa · 2024
Plug-in vehicles
19K
#34 in US
Battery-electric
12K
62% of fleet
EVs per public port
14.7
1,291 ports listed

As of 2024, Iowa had 19,000 plug-in vehicles registered — 11,700 fully battery-electric (62%) and 7,300 plug-in hybrid (38%). That ranks Iowa #34 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,291 publicly-listed ports in Iowa (535 Level 2 and 745 DC fast), that works out to roughly 14.7 EVs per public port and 15.7 BEVs per DC fast port.

Iowa has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Iowa drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Iowa market data →

More charging in Muscatine

See all →

HNI Corporation (Technology Center)

Muscatine, IA

Level 2EV Connect
1 station · 4 ports7.2 kW

Muscatine IA

Muscatine, IA

DC FastSHELL_RECHARGE
2 stations · 4 ports50 kW

HNI Corporation

Muscatine, IA

Level 2EV Connect
1 station · 4 ports7.2 kW

Oak Street

Muscatine, IA

Level 2EV Connect
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id168463
zip52761
cityMuscatine
plus4—
stateIA
ng_psi—
cng_psi—
countryUS
latitude41.436506
bd_blends—
longitude-91.082328
open_date2020-07-16
rd_blends—
ev_networkEV Connect
ev_pricing—
updated_at2026-06-12T04:32:43Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMuscatine Power and Water
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone866-816-7584
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "6334036a769d34776391f901",
    "6334036a769d34776391f902"
  ],
  "station": [
    "ca201b4d-23ec-493d-b582-ef44ac156dd5"
  ]
}
ev_network_webhttps://www.evconnect.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address3205 Cedar Street
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-06-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging