SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaAlto
GA-819330

GM - HAYES CHEVROLET GMC CADILLAC

3656 State Hwy 365, Alto, GA, 30510
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 4 ports
GM - HAYES CHEVROLET GMC CADILLAC · L2 J1772
EV Connect
AC L2 · 7.2 kW
Start session on EV Connect network →
1AJ1772· 7.2 kW· 240V/30A
GM - HAYES CHEVROLET GMC CADILLAC · DCFC CCS
EV Connect
DC fast · 50 kW
Start session on EV Connect network →
2ACCS· 50 kW· 480V/100A
2BCCS· 50 kW· 480V/100A
2CCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3656 State Hwy 365 · Alto, GA · 30510

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is GM - HAYES CHEVROLET GMC CADILLAC located?
GM - HAYES CHEVROLET GMC CADILLAC is located at 3656 State Hwy 365, Alto, GA.
What kind of charging does GM - HAYES CHEVROLET GMC CADILLAC offer?
GM - HAYES CHEVROLET GMC CADILLAC offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at GM - HAYES CHEVROLET GMC CADILLAC?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at GM - HAYES CHEVROLET GMC CADILLAC. Actual times vary with vehicle, temperature, and station load.
What are GM - HAYES CHEVROLET GMC CADILLAC's charging hours?
Open 24 hours
What charging network operates GM - HAYES CHEVROLET GMC CADILLAC?
GM - HAYES CHEVROLET GMC CADILLAC is part of the EV Connect network. See more EV Connect charging across GA on SpotCharge.
Can anyone use the chargers at GM - HAYES CHEVROLET GMC CADILLAC?
Yes — GM - HAYES CHEVROLET GMC CADILLAC is a publicly accessible charging location.
Is the GM - HAYES CHEVROLET GMC CADILLAC listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
21.4
6,853 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 6,853 publicly-listed ports in Georgia (3,756 Level 2 and 3,096 DC fast), that works out to roughly 21.4 EVs per public port and 38.8 BEVs per DC fast port.

Georgia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

Details
Hours
Open 24 hours
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging