SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaAlpharetta
GA-788219

GEORGIA POWER WILLS ROAD DC

11675 Wills Rd, Alpharetta, GA, 30009

GEORGIA POWER WILLS ROAD DC is an EV charging location in Alpharetta, GA with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
GEORGIA POWER WILLS ROAD DC · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
GEORGIA POWER WILLS ROAD DC · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

11675 Wills Rd · Alpharetta, GA · 30009

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is GEORGIA POWER WILLS ROAD DC located?
GEORGIA POWER WILLS ROAD DC is located at 11675 Wills Rd, Alpharetta, GA.
What kind of charging does GEORGIA POWER WILLS ROAD DC offer?
GEORGIA POWER WILLS ROAD DC offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at GEORGIA POWER WILLS ROAD DC?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at GEORGIA POWER WILLS ROAD DC. Actual times vary with vehicle, temperature, and station load.
What are GEORGIA POWER WILLS ROAD DC's charging hours?
24 hours daily
What charging network operates GEORGIA POWER WILLS ROAD DC?
GEORGIA POWER WILLS ROAD DC is part of the ChargePoint network. See more ChargePoint charging across GA on SpotCharge.
Can anyone use the chargers at GEORGIA POWER WILLS ROAD DC?
Yes — GEORGIA POWER WILLS ROAD DC is a publicly accessible charging location.
Is the GEORGIA POWER WILLS ROAD DC listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
19.2
7,642 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 7,642 publicly-listed ports in Georgia (4,170 Level 2 and 3,471 DC fast), that works out to roughly 19.2 EVs per public port and 34.6 BEVs per DC fast port.

Georgia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Georgia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More DC fast charging

DC fast charging in Alpharetta →DC fast charging in Georgia →ChargePoint in Georgia →

More charging in Alpharetta

See all →

Windward Commons - Tesla Supercharger

Alpharetta, GA

DC FastTesla
1 station · 16 ports325 kW

GA 400 Owner - Asset

Alpharetta, GA

Level 2Blink
1 station · 6 ports6.2 kW

MAIN DEALERSHIP PL #2

Alpharetta, GA

DC FastChargePoint
1 station · 2 ports120 kW

POPE&LAND 3000 SUMMIT PL

Alpharetta, GA

Level 2ChargePoint
1 station · 2 ports11.5 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Atlanta →All Georgia destinations →
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id217330
zip30009
cityAlpharetta
plus4—
stateGA
ng_psi—
cng_psi—
countryUS
latitude34.064516
bd_blends—
longitude-84.311701
open_date2022-05-11
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T02:09:19Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameGEORGIA POWER WILLS ROAD DC
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22051551"
  ],
  "station": [
    "USCPIL12785381"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address11675 Wills Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging