SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaBuford
GA-652310

Building 1B

2925 Buford Drive, Buford, GA, 30519
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$1.00-$2.00/Hr Variable Parking Fee

Stations & ports

1 station · 2 ports
Building 1B · L2 J1772
Blink Network
AC L2 · 7.2 kW
Start session on Blink Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2925 Buford Drive · Buford, GA · 30519

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Building 1B located?
Building 1B is located at 2925 Buford Drive, Buford, GA.
What kind of charging does Building 1B offer?
Building 1B offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Building 1B?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Building 1B. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Building 1B?
$1.00-$2.00/Hr Variable Parking Fee
What are Building 1B's charging hours?
Open 24 hours
What charging network operates Building 1B?
Building 1B is part of the Blink Network network. See more Blink Network charging across GA on SpotCharge.
Can anyone use the chargers at Building 1B?
Yes — Building 1B is a publicly accessible charging location.
Is the Building 1B listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
21.4
6,853 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 6,853 publicly-listed ports in Georgia (3,756 Level 2 and 3,096 DC fast), that works out to roughly 21.4 EVs per public port and 38.8 BEVs per DC fast port.

Georgia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More charging in Buford

See all →

TOPGOLF BUFORD EV 4

Buford, GA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

CPS50EXTBS CPF50_2

Buford, GA

Level 2ChargePoint Network
1 station · 1 port7.2 kW

The Water Tower

Buford, GA

Level 2ENVIROSPARK
1 station · 6 ports7.2 kW

Mall of Georgia Chrysler, Dodge, Jeep

Buford, GA

DC FastENVIROSPARK
1 station · 2 ports50 kW
Details
Hours
Open 24 hours
Pricing
$1.00-$2.00/Hr Variable Parking Fee
Phone
888-998-2546
Network
Blink Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging