SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaStone Mountain
GA-599006

Dekalb County Watershed Roadhaven Campus

1580 Roadhaven Dr, Stone Mountain, GA, 30080

Dekalb County Watershed Roadhaven Campus is an EV charging location in Stone Mountain, GA with 2 DC fast charging ports up to 120 kW on the Noodoe network. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
120 kW
DC fast
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Dekalb County Watershed Roadhaven Campus · DCFC CCS 120 kW
NOODOE
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on NOODOE network →
1ACCS· 120 kW
1BCCS· 120 kW

Estimated charging time

DC fast charging · 120 kW
~29 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1580 Roadhaven Dr · Stone Mountain, GA · 30080

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Dekalb County Watershed Roadhaven Campus located?
Dekalb County Watershed Roadhaven Campus is located at 1580 Roadhaven Dr, Stone Mountain, GA.
What kind of charging does Dekalb County Watershed Roadhaven Campus offer?
Dekalb County Watershed Roadhaven Campus offers DC fast charging, with stations rated up to 120 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Dekalb County Watershed Roadhaven Campus?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 29 min on 120 kW DC fast charging at Dekalb County Watershed Roadhaven Campus. Actual times vary with vehicle, temperature, and station load.
What charging network operates Dekalb County Watershed Roadhaven Campus?
Dekalb County Watershed Roadhaven Campus is part of the Noodoe network. See more Noodoe charging across GA on SpotCharge.
Can anyone use the chargers at Dekalb County Watershed Roadhaven Campus?
Yes — Dekalb County Watershed Roadhaven Campus is a publicly accessible charging location.
Is the Dekalb County Watershed Roadhaven Campus listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
18.8
7,775 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 7,775 publicly-listed ports in Georgia (4,227 Level 2 and 3,547 DC fast), that works out to roughly 18.8 EVs per public port and 33.8 BEVs per DC fast port.

Georgia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Georgia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More DC fast charging

DC fast charging in Stone Mountain →DC fast charging in Georgia →Noodoe in Georgia →

More charging in Stone Mountain

See all →

Electric Era Charging Station

Stone Mountain, GA

DC FastElectric Era
2 stations · 8 ports200 kW

MARTA GOLDSMITH L2 1

Stone Mountain, GA

Level 2ChargePoint
1 station · 2 ports6.5 kW

GWINETTCDJR CP6K STATION 2

Stone Mountain, GA

Level 2ChargePoint
1 station · 2 ports19.2 kW

District at Parkview

Stone Mountain, GA

Level 2Blink
1 station · 8 ports6.7 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Atlanta →All Georgia destinations →
Details
Phone
888-222-6618
Network
Noodoe ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id470598
zip30080
cityStone Mountain
plus4—
stateGA
ng_psi—
cng_psi—
countryUS
latitude33.8242469
bd_blends—
longitude-84.2031328
open_date2026-10-06
rd_blends—
ev_networkNOODOE
ev_pricing—
unverifiedNo
updated_at2026-11-03T04:51:29Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameDekalb County Watershed Roadhaven Campus
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-222-6618
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "6ac3be29ee47dd76a145b878",
    "6ac3be29ee47dd76a145b87c"
  ],
  "station": [
    "6ab6a60b06d4d10a79eefc75"
  ]
}
ev_network_webhttps://www.noodoe.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1580 Roadhaven Dr
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "NOODOE",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "NOODOE",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-11-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging