SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaStatesboro
GA-324048

JC Lewis Statesboro GA

6922 Veterans Memorial Pkwy, Statesboro, GA, 30458

JC Lewis Statesboro GA is a public in Statesboro, GA with 5 DC fast and Level 2 charging ports up to 180 kW on the Red E Charge network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
📅Open since 2024
Max power
180 kW
DC fast
Ports
5
ports
Hours
—
Pricing
—

Stations & ports

2 stations · 5 ports
JC Lewis Statesboro GA · DCFC CCS 180 kW
RED_E
DC fast · 180 kW

180 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on RED_E network →
1ACCS· 180 kW
1BCCS· 180 kW
JC Lewis Statesboro GA · L2 J1772 19.2 kW
RED_E
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on RED_E network →
2AJ1772· 19.2 kW
2BJ1772· 19.2 kW
2CJ1772· 19.2 kW

Estimated charging time

DC fast charging · 180 kW
~19 min
Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

6922 Veterans Memorial Pkwy · Statesboro, GA · 30458

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is JC Lewis Statesboro GA located?
JC Lewis Statesboro GA is located at 6922 Veterans Memorial Pkwy, Statesboro, GA.
What kind of charging does JC Lewis Statesboro GA offer?
JC Lewis Statesboro GA offers DC fast charging and Level 2 (AC) charging, with stations rated up to 180 kW. There are 2 charging stations and 5 total ports at this location.
How long does it take to charge an EV at JC Lewis Statesboro GA?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 19 min on 180 kW DC fast charging, or about 5 h 18 min on 11 kW Level 2 (AC) charging at JC Lewis Statesboro GA. Actual times vary with vehicle, temperature, and station load.
What charging network operates JC Lewis Statesboro GA?
JC Lewis Statesboro GA is part of the Red E Charge network. See more Red E Charge charging across GA on SpotCharge.
Can anyone use the chargers at JC Lewis Statesboro GA?
Yes — JC Lewis Statesboro GA is a publicly accessible charging location.
Is the JC Lewis Statesboro GA listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
19.2
7,642 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 7,642 publicly-listed ports in Georgia (4,170 Level 2 and 3,471 DC fast), that works out to roughly 19.2 EVs per public port and 34.6 BEVs per DC fast port.

Georgia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Georgia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More DC fast charging

DC fast charging in Statesboro →DC fast charging in Georgia →Red E Charge in Georgia →

More charging in Statesboro

See all →

CUSTOMER LVL2 INVENTORY

Statesboro, GA

DC FastChargePoint
2 stations · 2 ports62.5 kW

BRWK HYUNDAI CUSTOMER#1

Statesboro, GA

Level 2ChargePoint
1 station · 1 port7.7 kW

Georgia Southern University

Statesboro, GA

Level 2EnviroSpark
1 station · 10 ports6.7 kW

GSU

Statesboro, GA

Level 2evGateway
1 station · 2 ports7.2 kW
Details
Phone
313-262-6722
Network
Red E Charge ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id351960
zip30458
cityStatesboro
plus4—
stateGA
ng_psi—
cng_psi—
countryUS
latitude32.417622008154
bd_blends—
longitude-81.8004300375
open_date2024-07-17
rd_blends—
ev_networkRED_E
ev_pricing—
updated_at2026-09-19T04:04:49Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameJC Lewis Statesboro GA
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePUBLIC
nps_unit_name—
station_phone313-262-6722
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "1793*1",
    "1793*2",
    "1794*1",
    "1794*2",
    "1795"
  ],
  "station": [
    "453"
  ]
}
ev_network_webhttps://www.redecharge.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address6922 Veterans Memorial Pkwy
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num3
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging