SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaThomasville
GA-291303

SPENCE SPENCE #2

11646 US-319, Thomasville, GA, 31757
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
SPENCE SPENCE #2 · DCFC CCS
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
1ACCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

11646 US-319 · Thomasville, GA · 31757

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SPENCE SPENCE #2 located?
SPENCE SPENCE #2 is located at 11646 US-319, Thomasville, GA.
What kind of charging does SPENCE SPENCE #2 offer?
SPENCE SPENCE #2 offers DC fast charging, with stations rated up to 50 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at SPENCE SPENCE #2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at SPENCE SPENCE #2. Actual times vary with vehicle, temperature, and station load.
What are SPENCE SPENCE #2's charging hours?
Open 24 hours
What charging network operates SPENCE SPENCE #2?
SPENCE SPENCE #2 is part of the ChargePoint Network network. See more ChargePoint Network charging across GA on SpotCharge.
Can anyone use the chargers at SPENCE SPENCE #2?
Yes — SPENCE SPENCE #2 is a publicly accessible charging location.
Is the SPENCE SPENCE #2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
21.4
6,853 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 6,853 publicly-listed ports in Georgia (3,756 Level 2 and 3,096 DC fast), that works out to roughly 21.4 EVs per public port and 38.8 BEVs per DC fast port.

Georgia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More charging in Thomasville

See all →

Flowers Nissan

Thomasville, GA

Level 2Non-Networked
1 station · 1 port7.2 kW

Flowers Nissan

Thomasville, GA

Level 2AeroVironment
1 station · 1 port

SPENCE FAST CHARGER 1

Thomasville, GA

DC FastChargePoint Network
2 stations · 3 ports62.5 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging