SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaJonesboro
GA-104001

OPTIMUS CPO JONESBORO DC2

6510 Tara Blvd, Jonesboro, GA, 30236

OPTIMUS CPO JONESBORO DC2 is an EV charging location in Jonesboro, GA with 2 DC fast charging ports up to 160 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
160 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
OPTIMUS CPO JONESBORO DC2 · DCFC CCS 160 kW
ChargePoint Network
DC fast · 160 kW

160 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 160 kW
OPTIMUS CPO JONESBORO DC2 · DCFC Tesla 160 kW
ChargePoint Network
DC fast · 160 kW

160 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
2ATesla· 160 kW

Estimated charging time

DC fast charging · 160 kW
~22 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

6510 Tara Blvd · Jonesboro, GA · 30236

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is OPTIMUS CPO JONESBORO DC2 located?
OPTIMUS CPO JONESBORO DC2 is located at 6510 Tara Blvd, Jonesboro, GA.
What kind of charging does OPTIMUS CPO JONESBORO DC2 offer?
OPTIMUS CPO JONESBORO DC2 offers DC fast charging, with stations rated up to 160 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at OPTIMUS CPO JONESBORO DC2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 22 min on 160 kW DC fast charging at OPTIMUS CPO JONESBORO DC2. Actual times vary with vehicle, temperature, and station load.
What are OPTIMUS CPO JONESBORO DC2's charging hours?
24 hours daily
What charging network operates OPTIMUS CPO JONESBORO DC2?
OPTIMUS CPO JONESBORO DC2 is part of the ChargePoint network. See more ChargePoint charging across GA on SpotCharge.
Can anyone use the chargers at OPTIMUS CPO JONESBORO DC2?
Yes — OPTIMUS CPO JONESBORO DC2 is a publicly accessible charging location.
Is the OPTIMUS CPO JONESBORO DC2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
19.2
7,642 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 7,642 publicly-listed ports in Georgia (4,170 Level 2 and 3,471 DC fast), that works out to roughly 19.2 EVs per public port and 34.6 BEVs per DC fast port.

Georgia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Georgia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More DC fast charging

DC fast charging in Jonesboro →DC fast charging in Georgia →ChargePoint in Georgia →

More charging in Jonesboro

See all →

City of Jonesboro

Jonesboro, GA

Level 2EnviroSpark
1 station · 4 ports6.7 kW

European Collision Repair-Jonesboro - Tesla Destination

Jonesboro, GA

Level 2Tesla Destination
1 station · 1 port

MB - Shops at Tara - Jonesboro, GA

Jonesboro, GA

DC FastMercedes-Benz High-Power Charging
2 stations · 12 ports400 kW

Tara Crossing

Jonesboro, GA

DC FastEVgo
4 stations · 8 ports350 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Atlanta →All Georgia destinations →
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id458667
zip30236
cityJonesboro
plus4—
stateGA
ng_psi—
cng_psi—
countryUS
latitude33.576798
bd_blends—
longitude-84.372171
open_date2026-05-02
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:14:01Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameOPTIMUS CPO JONESBORO DC2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "30811491"
  ],
  "station": [
    "USCPIL19686561"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address6510 Tara Blvd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 160,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 160,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO, TESLA
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging