SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsGeorgiaWarner Robins
GA-003213

WARNER ROBINS DDA EV 1

112 S Armed Forces Blvd, Warner Robins, GA, 31088

WARNER ROBINS DDA EV 1 is an EV charging location in Warner Robins, GA with 2 Level 2 charging ports up to 19 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • S Armed Forces Blvd

    Source · NREL

Stations & ports

1 station · 2 ports
WARNER ROBINS DDA EV 1 · L2 J1772 19.2 kW
ChargePoint Network
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

112 S Armed Forces Blvd · Warner Robins, GA · 31088

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is WARNER ROBINS DDA EV 1 located?
WARNER ROBINS DDA EV 1 is located at 112 S Armed Forces Blvd, Warner Robins, GA.
What kind of charging does WARNER ROBINS DDA EV 1 offer?
WARNER ROBINS DDA EV 1 offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at WARNER ROBINS DDA EV 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at WARNER ROBINS DDA EV 1. Actual times vary with vehicle, temperature, and station load.
What are WARNER ROBINS DDA EV 1's charging hours?
24 hours daily
What charging network operates WARNER ROBINS DDA EV 1?
WARNER ROBINS DDA EV 1 is part of the ChargePoint network. See more ChargePoint charging across GA on SpotCharge.
Can anyone use the chargers at WARNER ROBINS DDA EV 1?
Yes — WARNER ROBINS DDA EV 1 is a publicly accessible charging location.
Is the WARNER ROBINS DDA EV 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Georgia · 2024
Plug-in vehicles
146K
#9 in US
Battery-electric
120K
82% of fleet
EVs per public port
19.2
7,642 ports listed

As of 2024, Georgia had 146,400 plug-in vehicles registered — 120,000 fully battery-electric (82%) and 26,400 plug-in hybrid (18%). That ranks Georgia #9 nationally and represents about 2.4% of all US plug-in registrations.

Across 7,642 publicly-listed ports in Georgia (4,170 Level 2 and 3,471 DC fast), that works out to roughly 19.2 EVs per public port and 34.6 BEVs per DC fast port.

Georgia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Georgia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Georgia market data →

More charging in Warner Robins

See all →

Robins AFB

Warner Robins, GA

Level 2
1 station · 2 ports

HIEX Warner Robins North West

Warner Robins, GA

Level 2EnviroSpark
1 station · 8 ports11.1 kW

FS FORD POWER LINK 1

Warner Robins, GA

DC FastChargePoint
1 station · 2 ports120 kW

FS FORD CL2 - PL2

Warner Robins, GA

DC FastChargePoint
1 station · 2 ports80 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id359937
zip31088
cityWarner Robins
plus4—
stateGA
ng_psi—
cng_psi—
countryUS
latitude32.618386
bd_blends—
longitude-83.599952
open_date2024-10-17
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:49:27Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWARNER ROBINS DDA EV 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "26272561",
    "26272571"
  ],
  "station": [
    "USCPIL16515001"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address112 S Armed Forces Blvd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsS Armed Forces Blvd
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging