JCQ Lake Ellenor - Tesla Destination
Orlando, FL
TGI Fridays is a parking lot in Orlando, FL with 4 DC fast charging ports up to 40 kW on the US Supercharge network. Pricing: $0.17 per kWh. 9am-5pm M-F. Public access. Listing data from NREL, last confirmed February 2026.
40 kW adds roughly 100 miles in about an hour, depending on the car.
Start session on US_SUPERCHARGE network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.
Across 15,601 publicly-listed ports in Florida (8,379 Level 2 and 7,220 DC fast), that works out to roughly 26 EVs per public port and 46.4 BEVs per DC fast port.
Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.
Source: AFDC (data from Experian Information Solutions) · See full Florida market data →
Orlando, FL
Orlando, FL
Orlando, FL
Orlando, FL
This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 449108 |
|---|---|
| zip | 32819 |
| city | Orlando |
| plus4 | — |
| state | FL |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 28.4365659 |
| bd_blends | — |
| longitude | -81.4709689 |
| open_date | 2024-11-21 |
| rd_blends | — |
| ev_network | US_SUPERCHARGE |
| ev_pricing | $0.17 per kWh |
| updated_at | 2026-02-13T16:34:38Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | TGI Fridays |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | PARKING_LOT |
| nps_unit_name | — |
| station_phone | 954-836-8300 |
| cards_accepted | CREDIT |
| ev_dc_fast_num | 4 |
| ev_network_web | https://ussupercharge.com/ |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 8955 International Dr |
| funding_sources | — |
| owner_type_code | P |
| access_days_time | 9am-5pm M-F |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "US_SUPERCHARGE",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 40,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "US_SUPERCHARGE",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 40,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "US_SUPERCHARGE",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 40,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "US_SUPERCHARGE",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 40,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | CREDIT_CARD_ALWAYS |
| cng_fill_type_code | — |
| ev_connector_types | J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-02-13 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | MD |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public - Credit card at all times |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public - Carte de crédit en tout temps |
| intersection_directions_fr | — |