SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaPalm Bay
FL-472285

Woodlake Village Office West

1700 Woodlake Dr NE, Palm Bay, FL, 32905

Woodlake Village Office West is a office building in Palm Bay, FL with 1 Level 2 charging port on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Contact station for hours of availability. By appointment. Listing data from NREL, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
📅Open since 2023
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
Hours
Contact station for hours of availability
Pricing
—

Stations & ports

1 station · 1 port
Woodlake Village Office West · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1700 Woodlake Dr NE · Palm Bay, FL · 32905

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Woodlake Village Office West located?
Woodlake Village Office West is located at 1700 Woodlake Dr NE, Palm Bay, FL.
What kind of charging does Woodlake Village Office West offer?
Woodlake Village Office West offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Woodlake Village Office West?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Woodlake Village Office West. Actual times vary with vehicle, temperature, and station load.
What are Woodlake Village Office West's charging hours?
Contact station for hours of availability
What charging network operates Woodlake Village Office West?
Woodlake Village Office West is part of the AmpUp network. See more AmpUp charging across FL on SpotCharge.
Can anyone use the chargers at Woodlake Village Office West?
Woodlake Village Office West is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Woodlake Village Office West listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
26
15,599 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 15,599 publicly-listed ports in Florida (8,377 Level 2 and 7,220 DC fast), that works out to roughly 26 EVs per public port and 46.4 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Palm Bay

See all →

Comfort Suites

Palm Bay, FL

DC FastFPL EVolution
1 station · 4 ports400 kW

Gary Yeomans Ford Palm Bay

Palm Bay, FL

DC FastBlink
1 station · 4 ports120 kW

CITY OF PALM BA COUNCIL CHAMBER

Palm Bay, FL

Level 2ChargePoint
1 station · 2 ports6.5 kW

Woodlake - Tennis Courts East

Palm Bay, FL

Level 2AmpUp
1 station · 2 ports
Details
Hours
Contact station for hours of availability
Network
AmpUp ↗
Access
By appointment
Workplace charging, mainly for employees · From NREL
Ownership
Privately owned
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id262192
zip32905
cityPalm Bay
plus4—
stateFL
ng_psi—
cng_psi—
countryUS
latitude28.0379857
bd_blends—
longitude-80.6070354
open_date2023-02-14
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2026-08-05T18:21:35Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWoodlake Village Office West
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOFFICE_BLDG
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1700 Woodlake Dr NE
funding_sources—
owner_type_codeP
access_days_timeContact station for hours of availability
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2023-06-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging