SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaFort Myers
FL-308612

The Edison Apartments

5015 Mina Circle, Fort Myers, FL, 33905
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 2 ports
The Edison Apartments · L2 J1772
Blink Network
AC L2 · 7.2 kW
Start session on Blink Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5015 Mina Circle · Fort Myers, FL · 33905

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is The Edison Apartments located?
The Edison Apartments is located at 5015 Mina Circle, Fort Myers, FL.
What kind of charging does The Edison Apartments offer?
The Edison Apartments offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at The Edison Apartments?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at The Edison Apartments. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at The Edison Apartments?
Free
What are The Edison Apartments's charging hours?
Open 24 hours
What charging network operates The Edison Apartments?
The Edison Apartments is part of the Blink Network network. See more Blink Network charging across FL on SpotCharge.
Can anyone use the chargers at The Edison Apartments?
Yes — The Edison Apartments is a publicly accessible charging location.
Is the The Edison Apartments listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
29.7
13,661 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 13,661 publicly-listed ports in Florida (7,440 Level 2 and 6,219 DC fast), that works out to roughly 29.7 EVs per public port and 53.8 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Fort Myers

See all →

Fort Myers BW MB.HPC

Fort Myers, FL

DC FastMERCEDES_BENZ
2 stations · 10 ports50 kW

MINI of Fort Myers

Fort Myers, FL

DC FastCHAEVI
1 station · 2 ports50 kW

Ft Myers Plant New Admin Building

Fort Myers, FL

Level 2Blink Network
1 station · 10 ports7.2 kW

Vista at Eastwood

Fort Myers, FL

Level 2Blink Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
Free
Phone
888-998-2546
Network
Blink Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging