SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaSaint Augustine
FL-070836

DLP Capital

405 Golfway W Dr, Saint Augustine, FL, 32095
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
DLP Capital · L2 J1772
SYNERGEV
AC L2 · 7.2 kW
Start session on SYNERGEV network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

405 Golfway W Dr · Saint Augustine, FL · 32095

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DLP Capital located?
DLP Capital is located at 405 Golfway W Dr, Saint Augustine, FL.
What kind of charging does DLP Capital offer?
DLP Capital offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at DLP Capital?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at DLP Capital. Actual times vary with vehicle, temperature, and station load.
What are DLP Capital's charging hours?
Open 24 hours
What charging network operates DLP Capital?
DLP Capital is part of the SYNERGEV network. See more SYNERGEV charging across FL on SpotCharge.
Can anyone use the chargers at DLP Capital?
Yes — DLP Capital is a publicly accessible charging location.
Is the DLP Capital listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
29.7
13,661 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 13,661 publicly-listed ports in Florida (7,440 Level 2 and 6,219 DC fast), that works out to roughly 29.7 EVs per public port and 53.8 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Saint Augustine

See all →

St. Augustine, FL - World Commerce Pkwy Supercharger

Saint Augustine, FL

DC FastTesla (Tesla-only charging)
1 station · 12 ports250 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

St. Augustine →All Florida destinations →
Details
Hours
Open 24 hours
Phone
888-807-4522
Network
SYNERGEV ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging