SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaTampa
FL-018372

CED Electric Supplies

4910 E Adamo Dr, Tampa, FL, 33605

CED Electric Supplies is a office building in Tampa, FL with 1 Level 2 charging port on the ChargeLab network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
CED Electric Supplies · L2 J1772
CHARGELAB
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on CHARGELAB network →
1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4910 E Adamo Dr · Tampa, FL · 33605

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CED Electric Supplies located?
CED Electric Supplies is located at 4910 E Adamo Dr, Tampa, FL.
What kind of charging does CED Electric Supplies offer?
CED Electric Supplies offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at CED Electric Supplies?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at CED Electric Supplies. Actual times vary with vehicle, temperature, and station load.
What charging network operates CED Electric Supplies?
CED Electric Supplies is part of the ChargeLab network. See more ChargeLab charging across FL on SpotCharge.
Can anyone use the chargers at CED Electric Supplies?
CED Electric Supplies is listed as by appointment access — check the details before visiting.
Is the CED Electric Supplies listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
26
15,599 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 15,599 publicly-listed ports in Florida (8,377 Level 2 and 7,220 DC fast), that works out to roughly 26 EVs per public port and 46.4 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Tampa

See all →

Cambria Hotel Tampa-Brandon - Tesla Destination

Tampa, FL

Level 2Tesla Destination
2 stations · 8 ports

Seminole Hardrock Hotel and Casino - Tesla Destination

Tampa, FL

Level 2Tesla Destination
1 station · 2 ports7 kW

Tampa, FL Rechargery Relay @ Wawa - W Waters Ave

Tampa, FL

DC FastIONNA
2 stations · 8 ports400 kW

Tampa, FL Rechargery Relay @ Wawa - N Dale Mabry Hwy

Tampa, FL

DC FastIONNA
2 stations · 6 ports400 kW
Details
Network
ChargeLab ↗
Access
By appointment

Last updated · 9 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging