SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsDistrict of ColumbiaWashington
DC-236643

FPB South Garage C level third parking space 240V charging station

200 Constitution St NW, Washington, DC, 20210
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2021
🚚Fits Light-duty (cars, SUVs)
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
FPB South Garage C level third parking space 240V charging station · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

200 Constitution St NW · Washington, DC · 20210

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is FPB South Garage C level third parking space 240V charging station located?
FPB South Garage C level third parking space 240V charging station is located at 200 Constitution St NW, Washington, DC.
What kind of charging does FPB South Garage C level third parking space 240V charging station offer?
FPB South Garage C level third parking space 240V charging station offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at FPB South Garage C level third parking space 240V charging station?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at FPB South Garage C level third parking space 240V charging station. Actual times vary with vehicle, temperature, and station load.
What are FPB South Garage C level third parking space 240V charging station's charging hours?
Open 24 hours
What charging network operates FPB South Garage C level third parking space 240V charging station?
FPB South Garage C level third parking space 240V charging station is part of the Non-Networked network. See more Non-Networked charging across DC on SpotCharge.
Can anyone use the chargers at FPB South Garage C level third parking space 240V charging station?
FPB South Garage C level third parking space 240V charging station is listed as by appointment access — check the details before visiting.
Is the FPB South Garage C level third parking space 240V charging station listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

District of Columbia · 2024
Plug-in vehicles
14K
#41 in US
Battery-electric
10K
70% of fleet
EVs per public port
15.3
944 ports listed

As of 2024, District of Columbia had 14,400 plug-in vehicles registered — 10,100 fully battery-electric (70%) and 4,300 plug-in hybrid (30%). That ranks District of Columbia #41 nationally and represents about 0.2% of all US plug-in registrations.

Across 944 publicly-listed ports in District of Columbia (862 Level 2 and 80 DC fast), that works out to roughly 15.3 EVs per public port and 126.3 BEVs per DC fast port.

District of Columbia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more District of Columbia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full District of Columbia market data →

More charging in Washington

See all →

Watergate 600 NHA

Washington, DC

Level 2Blink Network
1 station · 3 ports7.2 kW

Indure Build-To- Core Fund, LLC

Washington, DC

Level 2Blink Network
1 station · 6 ports7.2 kW

701 8th St. NW. Garage

Washington, DC

Level 2FLASH
1 station · 2 ports7.2 kW

2001 M St.

Washington, DC

Level 2Blink Network
1 station · 5 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Verified by NREL · 7 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id196747
zip20210
cityWashington
plus4—
stateDC
ng_psi—
cng_psi—
countryUS
latitude38.8936
bd_blends—
longitude-77.0148
open_date2021-09-21
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameFPB South Garage C level third parking space 240V charging station
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 13,
  "code": "DOL",
  "name": "Department of Labor"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address200 Constitution St NW
funding_sources—
owner_type_codeFG
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations
[
  {
    "id": 445547,
    "access_code": "private",
    "fuel_type_code": "ELEC"
  }
]
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging