SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutWillimantic
CT-911528

Windham Intermodal Transportation Center Garage

17 Walnut St, Willimantic, CT, 06226
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking garage
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 4 ports
Windham Intermodal Transportation Center Garage · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

17 Walnut St · Willimantic, CT · 06226

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Windham Intermodal Transportation Center Garage located?
Windham Intermodal Transportation Center Garage is located at 17 Walnut St, Willimantic, CT.
What kind of charging does Windham Intermodal Transportation Center Garage offer?
Windham Intermodal Transportation Center Garage offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Windham Intermodal Transportation Center Garage?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Windham Intermodal Transportation Center Garage. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Windham Intermodal Transportation Center Garage?
Free
What are Windham Intermodal Transportation Center Garage's charging hours?
Open 24 hours
What charging network operates Windham Intermodal Transportation Center Garage?
Windham Intermodal Transportation Center Garage is part of the Non-Networked network. See more Non-Networked charging across CT on SpotCharge.
Can anyone use the chargers at Windham Intermodal Transportation Center Garage?
Yes — Windham Intermodal Transportation Center Garage is a publicly accessible charging location.
Is the Windham Intermodal Transportation Center Garage listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
12.7
4,862 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 4,862 publicly-listed ports in Connecticut (3,696 Level 2 and 1,164 DC fast), that works out to roughly 12.7 EVs per public port and 33.8 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Willimantic

See all →

Windham Wastewater Plant

Willimantic, CT

Level 2AMPUP
1 station · 4 ports7.2 kW

Town of Windham Community Center

Willimantic, CT

Level 2AMPUP
1 station · 4 ports7.2 kW

Windham Municipal Parking Lot

Willimantic, CT

Level 2Non-Networked
1 station · 2 ports7.2 kW

Eastern Connecticut State University - Shakespeare Parking Garage

Willimantic, CT

Level 2Non-Networked
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
Free
Network
Non-Networked
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging