SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutHartford
CT-908030

METRO GROUND G STATION 1

150 High Street, Hartford, CT, 06103

METRO GROUND G STATION 1 is an EV charging location in Hartford, CT with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. Mon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:00am-6:00pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
Hours
Mon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:00am-6:00pm
Pricing
—

Finding this location

  • Ground Floor

    Source · NREL

Stations & ports

1 station · 2 ports
METRO GROUND G STATION 1 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

150 High Street · Hartford, CT · 06103

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is METRO GROUND G STATION 1 located?
METRO GROUND G STATION 1 is located at 150 High Street, Hartford, CT.
What kind of charging does METRO GROUND G STATION 1 offer?
METRO GROUND G STATION 1 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at METRO GROUND G STATION 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at METRO GROUND G STATION 1. Actual times vary with vehicle, temperature, and station load.
What are METRO GROUND G STATION 1's charging hours?
Mon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:00am-6:00pm
What charging network operates METRO GROUND G STATION 1?
METRO GROUND G STATION 1 is part of the ChargePoint network. See more ChargePoint charging across CT on SpotCharge.
Can anyone use the chargers at METRO GROUND G STATION 1?
Yes — METRO GROUND G STATION 1 is a publicly accessible charging location.
Is the METRO GROUND G STATION 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.8
5,267 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Hartford

See all →

SSG LOT2#1

Hartford, CT

Level 2ChargePoint
1 station · 1 port6.5 kW

SSG FSG#2

Hartford, CT

Level 2ChargePoint
1 station · 1 port6.5 kW

SSG ATRIUM#1

Hartford, CT

Level 2ChargePoint
1 station · 1 port6.5 kW

SSG SSG#1

Hartford, CT

Level 2ChargePoint
1 station · 1 port6.5 kW
Details
Hours
Mon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:00am-6:00pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id224616
zip06103
cityHartford
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.770214
bd_blends—
longitude-72.679452
open_date2022-07-29
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T02:13:08Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMETRO GROUND G STATION 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "22242561",
    "22242571"
  ],
  "station": [
    "USCPIL12951011"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address150 High Street
funding_sources—
owner_type_code—
access_days_timeMon: 6:00am-6:00pm; Tue: 6:00am-6:00pm; Wed: 6:00am-6:00pm; Thu: 6:00am-6:00pm; Fri: 6:00am-6:00pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsGround Floor
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging