SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutHamden
CT-866684

Altshuler Investments

103 Webb St, Hamden, CT, 06517
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Other
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$15 monthly service fee; $0.59 per kWh

Stations & ports

1 station · 2 ports
Altshuler Investments · L2 J1772
LOOP
AC L2 · 7.2 kW
Start session on LOOP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

103 Webb St · Hamden, CT · 06517

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Altshuler Investments located?
Altshuler Investments is located at 103 Webb St, Hamden, CT.
What kind of charging does Altshuler Investments offer?
Altshuler Investments offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Altshuler Investments?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Altshuler Investments. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Altshuler Investments?
$15 monthly service fee; $0.59 per kWh
What are Altshuler Investments's charging hours?
Open 24 hours
What charging network operates Altshuler Investments?
Altshuler Investments is part of the LOOP network. See more LOOP charging across CT on SpotCharge.
Can anyone use the chargers at Altshuler Investments?
Yes — Altshuler Investments is a publicly accessible charging location.
Is the Altshuler Investments listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
12.7
4,862 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 4,862 publicly-listed ports in Connecticut (3,696 Level 2 and 1,164 DC fast), that works out to roughly 12.7 EVs per public port and 33.8 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Hamden

See all →

ECR2

Hamden, CT

Level 2LOOP
1 station · 2 ports7.2 kW

ABCD Investments

Hamden, CT

Level 2LOOP
1 station · 4 ports7.2 kW

185 Welton St Hamden

Hamden, CT

Level 2SYNERGEV
1 station · 4 ports7.2 kW

Noble Hamden

Hamden, CT

Level 2FLO
1 station · 4 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
$15 monthly service fee; $0.59 per kWh
Phone
888-385-6671
Network
LOOP ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging