Schindler Elevator Corp 850 Brook St
Rocky Hill, CT
I-91 Tech Park is a office building in Rocky Hill, CT with 2 Level 2 charging ports on the ChargePoint network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. 24 hours daily; priority for Connecticut Green Bank employees. Public access. Listing data from NREL, last confirmed September 2026.
Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.
Start session on ChargePoint Network network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.
Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.
Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →
Rocky Hill, CT
Rocky Hill, CT
Rocky Hill, CT
Rocky Hill, CT
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 123274 |
|---|---|
| zip | 06106 |
| city | Hartford |
| plus4 | — |
| state | CT |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 41.641774 |
| bd_blends | — |
| longitude | -72.676125 |
| open_date | 2016-08-01 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| updated_at | 2026-09-14T19:35:57Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Green Bank |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | OFFICE_BLDG |
| nps_unit_name | — |
| station_phone | 860-563-0015 |
| cards_accepted | — |
| ev_dc_fast_num | — |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | 200-9 |
| hy_status_link | — |
| street_address | 75 Charter Oak Ave |
| funding_sources | — |
| owner_type_code | SG |
| access_days_time | 24 hours daily; priority for Connecticut Green Bank employees |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
},
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | Yes |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772 |
| ev_level1_evse_num | — |
| ev_level2_evse_num | 2 |
| access_days_time_fr | — |
| date_last_confirmed | 2026-09-14 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | Yes |
| maximum_vehicle_class | LD |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |