SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutMorris
CT-659341

White Flower Farm

167 Litchfield Rd, Morris, CT, 06763

White Flower Farm is a other in Morris, CT with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: $0.40 per kWh. Public access. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Other
📅Open since 2023
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
$0.40 per kWh
$0.40 per kWh

Stations & ports

1 station · 2 ports
White Flower Farm · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

167 Litchfield Rd · Morris, CT · 06763

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is White Flower Farm located?
White Flower Farm is located at 167 Litchfield Rd, Morris, CT.
What kind of charging does White Flower Farm offer?
White Flower Farm offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at White Flower Farm?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at White Flower Farm. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at White Flower Farm?
$0.40 per kWh
What charging network operates White Flower Farm?
White Flower Farm is part of the AmpUp network. See more AmpUp charging across CT on SpotCharge.
Can anyone use the chargers at White Flower Farm?
Yes — White Flower Farm is a publicly accessible charging location.
How do you pay for charging at White Flower Farm?
White Flower Farm accepts Mastercard, American Express, Discover, Apple Pay and Google Pay, according to NREL.
Is the White Flower Farm listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.7
5,292 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,292 publicly-listed ports in Connecticut (4,082 Level 2 and 1,208 DC fast), that works out to roughly 11.7 EVs per public port and 32.6 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Morris

See all →

Winvian Farm

Morris, CT

Level 2Tesla Destination
1 station · 2 ports16 kW
Details
Pricing
$0.40 per kWh
Phone
774-450-5015
Network
AmpUp ↗
Access
Public access
Payment
Mastercard, American Express, Discover, Apple Pay, Google Pay
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 3 weeks ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id319433
zip06763
cityMorris
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.6985259
bd_blends—
longitude-73.184522
open_date2023-05-04
rd_blends—
ev_networkAMPUP
ev_pricing$0.40 per kWh
updated_at2026-10-13T00:22:13Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWhite Flower Farm
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOTHER
nps_unit_name—
station_phone774-450-5015
cards_acceptedA ANDROID_PAY APPLE_PAY CREDIT D M
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address167 Litchfield Rd
funding_sources—
owner_type_codeP
access_days_timeContact site for information
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-10-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging