SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutRidgefield
CT-413623

BMW RIDGEFIELD RIDGEFIELD 1

746 US-7, Ridgefield, CT, 06877

BMW RIDGEFIELD RIDGEFIELD 1 is an EV charging location in Ridgefield, CT with 2 DC fast charging ports up to 113 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
112.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
BMW RIDGEFIELD RIDGEFIELD 1 · DCFC CHAdeMO 112.5 kW
ChargePoint Network
DC fast · 112.5 kW

112.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 112.5 kW
BMW RIDGEFIELD RIDGEFIELD 1 · DCFC CCS 112 kW
ChargePoint Network
DC fast · 112 kW

112 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 112 kW

Estimated charging time

DC fast charging · 112.5 kW
~31 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

746 US-7 · Ridgefield, CT · 06877

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BMW RIDGEFIELD RIDGEFIELD 1 located?
BMW RIDGEFIELD RIDGEFIELD 1 is located at 746 US-7, Ridgefield, CT.
What kind of charging does BMW RIDGEFIELD RIDGEFIELD 1 offer?
BMW RIDGEFIELD RIDGEFIELD 1 offers DC fast charging, with stations rated up to 112.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at BMW RIDGEFIELD RIDGEFIELD 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 31 min on 112.5 kW DC fast charging at BMW RIDGEFIELD RIDGEFIELD 1. Actual times vary with vehicle, temperature, and station load.
What are BMW RIDGEFIELD RIDGEFIELD 1's charging hours?
24 hours daily
What charging network operates BMW RIDGEFIELD RIDGEFIELD 1?
BMW RIDGEFIELD RIDGEFIELD 1 is part of the ChargePoint network. See more ChargePoint charging across CT on SpotCharge.
Can anyone use the chargers at BMW RIDGEFIELD RIDGEFIELD 1?
Yes — BMW RIDGEFIELD RIDGEFIELD 1 is a publicly accessible charging location.
Is the BMW RIDGEFIELD RIDGEFIELD 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.8
5,267 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More DC fast charging

DC fast charging in Ridgefield →DC fast charging in Connecticut →ChargePoint in Connecticut →

More charging in Ridgefield

See all →

Nod Hill Brewery (CT) - Tesla Destination

Ridgefield, CT

Level 2Tesla Destination
2 stations · 6 ports7 kW

467 Main

Ridgefield, CT

Level 2Blink
1 station · 6 ports16.6 kW

Town of Ridgefield

Ridgefield, CT

Level 2
1 station · 2 ports

The Ridgefield Playhouse

Ridgefield, CT

Level 2
1 station · 2 ports
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id260098
zip06877
cityRidgefield
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.330654
bd_blends—
longitude-73.472962
open_date2023-04-29
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:13:06Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameBMW RIDGEFIELD RIDGEFIELD 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22552691"
  ],
  "station": [
    "USCPIL13219081"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address746 US-7
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 112.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 112,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging