SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutManchester
CT-395341

Buckley Elementary School

250 Vernon St, Manchester, CT, 06042
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏫School
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 4 ports
Buckley Elementary School · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

250 Vernon St · Manchester, CT · 06042

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Buckley Elementary School located?
Buckley Elementary School is located at 250 Vernon St, Manchester, CT.
What kind of charging does Buckley Elementary School offer?
Buckley Elementary School offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Buckley Elementary School?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Buckley Elementary School. Actual times vary with vehicle, temperature, and station load.
What are Buckley Elementary School's charging hours?
Open 24 hours
What charging network operates Buckley Elementary School?
Buckley Elementary School is part of the AMPUP network. See more AMPUP charging across CT on SpotCharge.
Can anyone use the chargers at Buckley Elementary School?
Yes — Buckley Elementary School is a publicly accessible charging location.
Is the Buckley Elementary School listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
12.7
4,862 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 4,862 publicly-listed ports in Connecticut (3,696 Level 2 and 1,164 DC fast), that works out to roughly 12.7 EVs per public port and 33.8 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Manchester

See all →

Purnell Place Island 1

Manchester, CT

Level 2AMPUP
1 station · 2 ports7.2 kW

Purnell PlaceIsland 4 SouthSide

Manchester, CT

Level 2AMPUP
1 station · 2 ports7.2 kW

Public Works

Manchester, CT

Level 2AMPUP
1 station · 8 ports7.2 kW

VERNON SHELL STATION 1

Manchester, CT

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
860-647-5086
Network
AMPUP ↗
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging