SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutMiddletown
CT-378289

Wesleyan University - Exley DCFC

265 Church St, Middletown, CT, 06459

Wesleyan University - Exley DCFC is an EV charging location in Middletown, CT with 4 DC fast charging ports up to 50 kW on the FLO network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 4 ports
Wesleyan University - Exley DCFC · DCFC CCS 50 kW
FLO
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on FLO network →
1ACCS· 50 kW
1BCCS· 50 kW
Wesleyan University - Exley DCFC · DCFC CHAdeMO 50 kW
FLO
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on FLO network →
2ACHAdeMO· 50 kW
2BCHAdeMO· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

265 Church St · Middletown, CT · 06459

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Wesleyan University - Exley DCFC located?
Wesleyan University - Exley DCFC is located at 265 Church St, Middletown, CT.
What kind of charging does Wesleyan University - Exley DCFC offer?
Wesleyan University - Exley DCFC offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Wesleyan University - Exley DCFC?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at Wesleyan University - Exley DCFC. Actual times vary with vehicle, temperature, and station load.
What are Wesleyan University - Exley DCFC's charging hours?
24 hours daily
What charging network operates Wesleyan University - Exley DCFC?
Wesleyan University - Exley DCFC is part of the FLO network. See more FLO charging across CT on SpotCharge.
Can anyone use the chargers at Wesleyan University - Exley DCFC?
Yes — Wesleyan University - Exley DCFC is a publicly accessible charging location.
Is the Wesleyan University - Exley DCFC listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.8
5,267 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More DC fast charging

DC fast charging in Middletown →DC fast charging in Connecticut →FLO in Connecticut →

More charging in Middletown

See all →

Springside Middletown - Tesla Destination

Middletown, CT

Level 2Tesla Destination
2 stations · 24 ports

Marino Lot (aka Lot A), Middletown, CT 06457

Middletown, CT

Level 2FLO
1 station · 4 ports10 kW

Melilli Plaza Parking Lot

Middletown, CT

Level 2FLO
1 station · 8 ports6.2 kW

ENG-000047

Middletown, CT

Level 2WEVO
1 station · 2 ports7.2 kW
Details
Hours
24 hours daily
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id316537
zip06459
cityMiddletown
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.5533466
bd_blends—
longitude-72.6577488
open_date2023-11-02
rd_blends—
ev_networkFLO
ev_pricing—
updated_at2026-09-18T04:40:11Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWesleyan University - Exley DCFC
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-356-8911
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "35470895-ee13-4e24-aa5b-d78b98467dd6",
    "87398f82-9fd7-4745-b8b0-599267b2e8bd"
  ],
  "station": [
    "1f4d6257-6dfc-4cc4-9764-2f3040745022"
  ]
}
ev_network_webhttps://www.flo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address265 Church St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging