SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutStamford
CT-350949

460 SUMMER STATION 2

460 Summer St, Stamford, CT, 06901

460 SUMMER STATION 2 is an EV charging location in Stamford, CT with 1 Level 2 charging port up to 4 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
3.8 kW
AC Level 2
Ports
1
port
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Spot 20

    Source · NREL

Stations & ports

1 station · 1 port
460 SUMMER STATION 2 · L2 J1772 3.8 kW
ChargePoint Network
AC L2 · 3.8 kW

3.8 kW adds roughly 15 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 3.8 kW

Estimated charging time

Level 2 (AC) · 3.8 kW
~15 h 21 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

460 Summer St · Stamford, CT · 06901

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 460 SUMMER STATION 2 located?
460 SUMMER STATION 2 is located at 460 Summer St, Stamford, CT.
What kind of charging does 460 SUMMER STATION 2 offer?
460 SUMMER STATION 2 offers Level 2 (AC) charging, with stations rated up to 3.8 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at 460 SUMMER STATION 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 15 h 21 min on 3.8 kW Level 2 (AC) charging at 460 SUMMER STATION 2. Actual times vary with vehicle, temperature, and station load.
What are 460 SUMMER STATION 2's charging hours?
24 hours daily
What charging network operates 460 SUMMER STATION 2?
460 SUMMER STATION 2 is part of the ChargePoint network. See more ChargePoint charging across CT on SpotCharge.
Can anyone use the chargers at 460 SUMMER STATION 2?
Yes — 460 SUMMER STATION 2 is a publicly accessible charging location.
Is the 460 SUMMER STATION 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.8
5,267 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Stamford

See all →

Bulls Head Shopping Center 42 thru 91 High Ridge Road

Stamford, CT

Level 2FLO
1 station · 5 ports6.2 kW

S1

Stamford, CT

Level 2Blink
1 station · 8 ports6.2 kW

18 Dock St

Stamford, CT

Level 2LOOP
1 station · 46 ports7.7 kW

S2 (Series Chargers)

Stamford, CT

Level 2Blink
1 station · 8 ports6.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id460626
zip06901
cityStamford
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.056479
bd_blends—
longitude-73.540778
open_date2026-06-04
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-15T03:21:08Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_name460 SUMMER STATION 2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "31208001"
  ],
  "station": [
    "USCPIL19923431"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address460 Summer St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 3.8,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsSpot 20
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging