SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutSimsbury
CT-181159

HGENESIS NISSAN LS LEFT

46 Albany Turnpike, Simsbury, CT, 06092

HGENESIS NISSAN LS LEFT is an EV charging location in Simsbury, CT with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
HGENESIS NISSAN LS LEFT · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
HGENESIS NISSAN LS LEFT · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

46 Albany Turnpike · Simsbury, CT · 06092

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is HGENESIS NISSAN LS LEFT located?
HGENESIS NISSAN LS LEFT is located at 46 Albany Turnpike, Simsbury, CT.
What kind of charging does HGENESIS NISSAN LS LEFT offer?
HGENESIS NISSAN LS LEFT offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at HGENESIS NISSAN LS LEFT?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at HGENESIS NISSAN LS LEFT. Actual times vary with vehicle, temperature, and station load.
What are HGENESIS NISSAN LS LEFT's charging hours?
24 hours daily
What charging network operates HGENESIS NISSAN LS LEFT?
HGENESIS NISSAN LS LEFT is part of the ChargePoint network. See more ChargePoint charging across CT on SpotCharge.
Can anyone use the chargers at HGENESIS NISSAN LS LEFT?
Yes — HGENESIS NISSAN LS LEFT is a publicly accessible charging location.
Is the HGENESIS NISSAN LS LEFT listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.7
5,292 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,292 publicly-listed ports in Connecticut (4,082 Level 2 and 1,208 DC fast), that works out to roughly 11.7 EVs per public port and 32.6 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More DC fast charging

DC fast charging in Simsbury →DC fast charging in Connecticut →ChargePoint in Connecticut →

More charging in Simsbury

See all →

ENG-000091

Simsbury, CT

Level 2WEVO
1 station · 2 ports7.2 kW

Westminster School

Simsbury, CT

Level 2AmpUp
1 station · 2 ports

HTOYOTA TOYOTA F LEFT

Simsbury, CT

DC FastChargePoint
2 stations · 2 ports125 kW

Simsbury 1820 House

Simsbury, CT

Level 2evGateway
1 station · 4 ports7.7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id353150
zip06092
citySimsbury
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.820081
bd_blends—
longitude-72.869256
open_date2024-08-21
rd_blends—
ev_networkChargePoint Network
ev_pricing—
unverifiedNo
updated_at2026-11-01T03:09:00Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameHGENESIS NISSAN LS LEFT
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "23808641"
  ],
  "station": [
    "USCPIL14306551"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address46 Albany Turnpike
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-11-01
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging