SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutEllington
CT-138868

EARTHLIGHT CPE250_1

128 West Rd, Ellington, CT, 06029

EARTHLIGHT CPE250_1 is an EV charging location in Ellington, CT with 2 DC fast charging ports up to 125 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
125 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
EARTHLIGHT CPE250_1 · DCFC CCS 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 125 kW
EARTHLIGHT CPE250_1 · DCFC Tesla 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ATesla· 125 kW

Estimated charging time

DC fast charging · 125 kW
~28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

128 West Rd · Ellington, CT · 06029

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is EARTHLIGHT CPE250_1 located?
EARTHLIGHT CPE250_1 is located at 128 West Rd, Ellington, CT.
What kind of charging does EARTHLIGHT CPE250_1 offer?
EARTHLIGHT CPE250_1 offers DC fast charging, with stations rated up to 125 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at EARTHLIGHT CPE250_1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 28 min on 125 kW DC fast charging at EARTHLIGHT CPE250_1. Actual times vary with vehicle, temperature, and station load.
What are EARTHLIGHT CPE250_1's charging hours?
24 hours daily
What charging network operates EARTHLIGHT CPE250_1?
EARTHLIGHT CPE250_1 is part of the ChargePoint network. See more ChargePoint charging across CT on SpotCharge.
Can anyone use the chargers at EARTHLIGHT CPE250_1?
Yes — EARTHLIGHT CPE250_1 is a publicly accessible charging location.
Is the EARTHLIGHT CPE250_1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.7
5,292 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,292 publicly-listed ports in Connecticut (4,082 Level 2 and 1,208 DC fast), that works out to roughly 11.7 EVs per public port and 32.6 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More DC fast charging

DC fast charging in Ellington →DC fast charging in Connecticut →ChargePoint in Connecticut →

More charging in Ellington

See all →

135 West Rd

Ellington, CT

Level 2LOOP
1 station · 4 ports7.7 kW

MODERN MILKMAN OAK2

Ellington, CT

Level 2ChargePoint
1 station · 1 port12 kW

Bolles Motors Ellington

Ellington, CT

DC FastLevel 2Vialynk
2 stations · 8 ports180 kW

TOWN HALL ANNEX

Ellington, CT

Level 2AmpUp
1 station · 2 ports
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id234718
zip06029
cityEllington
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.886454
bd_blends—
longitude-72.466019
open_date2022-10-21
rd_blends—
ev_networkChargePoint Network
ev_pricing—
unverifiedNo
updated_at2026-11-05T02:13:15Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEARTHLIGHT CPE250_1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22366201"
  ],
  "station": [
    "USCPIL13058451"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address128 West Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 125,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 125,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO, TESLA
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-11-05
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging