SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutHartford
CT-132571

CT Green Bank

57 Charter Oak Ave, Hartford, CT, 06106
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
Max power
7.2 kW
AC Level 2
Ports
8
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 8 ports
CT Green Bank · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

57 Charter Oak Ave · Hartford, CT · 06106

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CT Green Bank located?
CT Green Bank is located at 57 Charter Oak Ave, Hartford, CT.
What kind of charging does CT Green Bank offer?
CT Green Bank offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 8 total ports at this location.
How long does it take to charge an EV at CT Green Bank?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CT Green Bank. Actual times vary with vehicle, temperature, and station load.
What are CT Green Bank's charging hours?
Open 24 hours
What charging network operates CT Green Bank?
CT Green Bank is part of the AMPUP network. See more AMPUP charging across CT on SpotCharge.
Can anyone use the chargers at CT Green Bank?
CT Green Bank is listed as by appointment access — check the details before visiting.
Is the CT Green Bank listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
12.7
4,862 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 4,862 publicly-listed ports in Connecticut (3,696 Level 2 and 1,164 DC fast), that works out to roughly 12.7 EVs per public port and 33.8 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Hartford

See all →

SSG LOT2#1

Hartford, CT

Level 2ChargePoint Network
1 station · 1 port7.2 kW

SSG FSG#2

Hartford, CT

Level 2ChargePoint Network
1 station · 1 port7.2 kW

SSG ATRIUM#1

Hartford, CT

Level 2ChargePoint Network
1 station · 1 port7.2 kW

SSG SSG#1

Hartford, CT

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Network
AMPUP ↗
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging