SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsConnecticutNiantic
CT-072764

East Lyme Hope Street Parking Lot

11 Hope St, Niantic, CT, 06357

East Lyme Hope Street Parking Lot is a other in Niantic, CT with 2 Level 2 charging ports up to 19 kW on the LOOP network. Pricing: $50 monthly service fee; $0.40 per kWh. 24 hours daily. Public access. Listing data from NREL, last confirmed July 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Other
📅Open since 2025
🚚Fits Light-duty (cars, SUVs)
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
Tiered pricing
$50 monthly service fee; $0.40 per kWh

Stations & ports

1 station · 2 ports
East Lyme Hope Street Parking Lot · L2 J1772 19.2 kW
LOOP
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on LOOP network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

11 Hope St · Niantic, CT · 06357

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is East Lyme Hope Street Parking Lot located?
East Lyme Hope Street Parking Lot is located at 11 Hope St, Niantic, CT.
What kind of charging does East Lyme Hope Street Parking Lot offer?
East Lyme Hope Street Parking Lot offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at East Lyme Hope Street Parking Lot?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at East Lyme Hope Street Parking Lot. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at East Lyme Hope Street Parking Lot?
$50 monthly service fee; $0.40 per kWh
What are East Lyme Hope Street Parking Lot's charging hours?
24 hours daily
What charging network operates East Lyme Hope Street Parking Lot?
East Lyme Hope Street Parking Lot is part of the LOOP network. See more LOOP charging across CT on SpotCharge.
Can anyone use the chargers at East Lyme Hope Street Parking Lot?
Yes — East Lyme Hope Street Parking Lot is a publicly accessible charging location.
How do you pay for charging at East Lyme Hope Street Parking Lot?
East Lyme Hope Street Parking Lot accepts Visa, Mastercard, American Express, Discover, Apple Pay, Google Pay and Network account balance, according to NREL.
Is the East Lyme Hope Street Parking Lot listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Connecticut · 2024
Plug-in vehicles
62K
#22 in US
Battery-electric
39K
64% of fleet
EVs per public port
11.8
5,267 ports listed

As of 2024, Connecticut had 61,900 plug-in vehicles registered — 39,400 fully battery-electric (64%) and 22,500 plug-in hybrid (36%). That ranks Connecticut #22 nationally and represents about 1.0% of all US plug-in registrations.

Across 5,267 publicly-listed ports in Connecticut (4,070 Level 2 and 1,195 DC fast), that works out to roughly 11.8 EVs per public port and 33 BEVs per DC fast port.

Connecticut has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Connecticut drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Connecticut market data →

More charging in Niantic

See all →

East Lyme Methodist Street Parking Lot

Niantic, CT

Level 2LOOP
1 station · 2 ports19.2 kW

East Lyme Town Hall

Niantic, CT

DC FastLOOP
1 station · 4 ports75 kW

MHA DOUGLAS 18

Niantic, CT

Level 2ChargePoint
1 station · 2 ports6.5 kW

Rocky Neck State Park

Niantic, CT

Level 2
1 station · 2 ports
Details
Hours
24 hours daily
Pricing
$50 monthly service fee; $0.40 per kWh
Phone
888-385-6671
Network
LOOP ↗
Access
Public access
Payment
Visa, Mastercard, American Express, Discover, Apple Pay, Google Pay, Network account balance
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 2 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id453211
zip06357
cityNiantic
plus4—
stateCT
ng_psi—
cng_psi—
countryUS
latitude41.3245321431278
bd_blends—
longitude-72.1937682490628
open_date2025-07-21
rd_blends—
ev_networkLOOP
ev_pricing$50 monthly service fee; $0.40 per kWh
updated_at2026-07-15T18:44:25Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEast Lyme Hope Street Parking Lot
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOTHER
nps_unit_name—
station_phone888-385-6671
cards_acceptedA ACCOUNT_BALANCE ANDROID_PAY APPLE_PAY D M V
ev_dc_fast_num—
ev_network_webhttps://loopglobal.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address11 Hope St
funding_sources—
owner_type_codeP
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "LOOP",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "LOOP",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-07-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging