SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoLittleton
CO-978319

CRESTLINE CRESTLINE

5398 S Rio Grande St, Littleton, CO, 80165
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
CRESTLINE CRESTLINE · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5398 S Rio Grande St · Littleton, CO · 80165

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CRESTLINE CRESTLINE located?
CRESTLINE CRESTLINE is located at 5398 S Rio Grande St, Littleton, CO.
What kind of charging does CRESTLINE CRESTLINE offer?
CRESTLINE CRESTLINE offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at CRESTLINE CRESTLINE?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CRESTLINE CRESTLINE. Actual times vary with vehicle, temperature, and station load.
What are CRESTLINE CRESTLINE's charging hours?
Open 24 hours
What charging network operates CRESTLINE CRESTLINE?
CRESTLINE CRESTLINE is part of the ChargePoint Network network. See more ChargePoint Network charging across CO on SpotCharge.
Can anyone use the chargers at CRESTLINE CRESTLINE?
Yes — CRESTLINE CRESTLINE is a publicly accessible charging location.
Is the CRESTLINE CRESTLINE listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
26.3
6,678 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 6,678 publicly-listed ports in Colorado (4,312 Level 2 and 2,366 DC fast), that works out to roughly 26.3 EVs per public port and 53.7 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Littleton

See all →

AMLI Littleton Village

Littleton, CO

Level 2LOOP
1 station · 38 ports7.2 kW

LOCKHEED SPACE B352-EV 1

Littleton, CO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

EV Arc 2020

Littleton, CO

Level 2Non-Networked
2 stations · 4 ports7.2 kW

NREL Golden Warehouse

Littleton, CO

Level 2Non-Networked
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging