SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoPagosa Springs
CO-925077

WCSA LEVEL 3 ESP250

USFS-391, Pagosa Springs, CO, 81147

WCSA LEVEL 3 ESP250 is an EV charging location in Pagosa Springs, CO with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Lower parking lot near road

    Source · NREL

Stations & ports

2 stations · 2 ports
WCSA LEVEL 3 ESP250 · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
WCSA LEVEL 3 ESP250 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

USFS-391 · Pagosa Springs, CO · 81147

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is WCSA LEVEL 3 ESP250 located?
WCSA LEVEL 3 ESP250 is located at USFS-391, Pagosa Springs, CO.
What kind of charging does WCSA LEVEL 3 ESP250 offer?
WCSA LEVEL 3 ESP250 offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at WCSA LEVEL 3 ESP250?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at WCSA LEVEL 3 ESP250. Actual times vary with vehicle, temperature, and station load.
What are WCSA LEVEL 3 ESP250's charging hours?
24 hours daily
What charging network operates WCSA LEVEL 3 ESP250?
WCSA LEVEL 3 ESP250 is part of the ChargePoint network. See more ChargePoint charging across CO on SpotCharge.
Can anyone use the chargers at WCSA LEVEL 3 ESP250?
Yes — WCSA LEVEL 3 ESP250 is a publicly accessible charging location.
Is the WCSA LEVEL 3 ESP250 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
23.4
7,502 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 7,502 publicly-listed ports in Colorado (4,774 Level 2 and 2,728 DC fast), that works out to roughly 23.4 EVs per public port and 46.6 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More DC fast charging

DC fast charging in Pagosa Springs →DC fast charging in Colorado →ChargePoint in Colorado →

More charging in Pagosa Springs

See all →

Camino Real Pagosa - Tesla Supercharger

Pagosa Springs, CO

DC FastTesla
1 station · 8 ports

The Springs Resort

Pagosa Springs, CO

Level 2LOOP
1 station · 5 ports7.7 kW

ROSE MOUNTAIN ROSE MOUNTAIN 1

Pagosa Springs, CO

Level 2ChargePoint
1 station · 2 ports6.5 kW

CENTENNIAL PARK PAGOSA SPGS PL1

Pagosa Springs, CO

DC FastChargePoint
2 stations · 2 ports200 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id191393
zip81147
cityPagosa Springs
plus4—
stateCO
ng_psi—
cng_psi—
countryUS
latitude37.473169
bd_blends—
longitude-106.792402
open_date2021-06-23
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T01:52:01Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWCSA LEVEL 3 ESP250
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "14219361"
  ],
  "station": [
    "USCPIL8155251"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_addressUSFS-391
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsLower parking lot near road
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging