SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoDacono
CO-652997

Interstate Ford

120 Laura Court, Dacono, CO, 80514
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 4 ports
Interstate Ford · DCFC CCS
FORD_CHARGE
DC fast · 50 kW
Start session on FORD_CHARGE network →
1ACCS· 50 kW· 480V/100A
1BCCS· 50 kW· 480V/100A
1CCCS· 50 kW· 480V/100A
1DCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

120 Laura Court · Dacono, CO · 80514

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Interstate Ford located?
Interstate Ford is located at 120 Laura Court, Dacono, CO.
What kind of charging does Interstate Ford offer?
Interstate Ford offers DC fast charging, with stations rated up to 50 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Interstate Ford?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at Interstate Ford. Actual times vary with vehicle, temperature, and station load.
What are Interstate Ford's charging hours?
Open 24 hours
What charging network operates Interstate Ford?
Interstate Ford is part of the FORD_CHARGE network. See more FORD_CHARGE charging across CO on SpotCharge.
Can anyone use the chargers at Interstate Ford?
Yes — Interstate Ford is a publicly accessible charging location.
Is the Interstate Ford listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
26.3
6,678 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 6,678 publicly-listed ports in Colorado (4,312 Level 2 and 2,366 DC fast), that works out to roughly 26.3 EVs per public port and 53.7 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Dacono

See all →

MAVERIK DACONO PL2

Dacono, CO

DC FastChargePoint Network
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Phone
888-357-1009
Network
FORD_CHARGE ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging