SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoFraser
CO-505601

Trailblazers

566 County Rd 721, Fraser, CO, 80442
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
10
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 10 ports
Trailblazers · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

566 County Rd 721 · Fraser, CO · 80442

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Trailblazers located?
Trailblazers is located at 566 County Rd 721, Fraser, CO.
What kind of charging does Trailblazers offer?
Trailblazers offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 10 total ports at this location.
How long does it take to charge an EV at Trailblazers?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Trailblazers. Actual times vary with vehicle, temperature, and station load.
What are Trailblazers's charging hours?
Open 24 hours
What charging network operates Trailblazers?
Trailblazers is part of the AMPUP network. See more AMPUP charging across CO on SpotCharge.
Can anyone use the chargers at Trailblazers?
Yes — Trailblazers is a publicly accessible charging location.
Is the Trailblazers listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
26.3
6,678 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 6,678 publicly-listed ports in Colorado (4,312 Level 2 and 2,366 DC fast), that works out to roughly 26.3 EVs per public port and 53.7 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Fraser

See all →

TOWN OF FRASER LIONS PONDS

Fraser, CO

DC FastChargePoint Network
2 stations · 2 ports50 kW

TOWN OF FRASER THE FOUNDRY

Fraser, CO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
443-545-9501
Network
AMPUP ↗
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging