SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoDenver
CO-282247

CCD CHARGING GVR

4856 Andes Ct, Denver, CO, 80249

CCD CHARGING GVR is an EV charging location in Denver, CO with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. Mon: 7:00am-9:00pm; Tue: 7:00am-9:00pm; Wed: 7:00am-9:00pm; Thu: 7:00am-9:00pm; Fri: 7:00am-9:00pm; Sat: 7:00am-9:00pm; Sun: 7:00am-9:00pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
Hours
Mon: 7:00am-9:00pm; Tue: 7:00am-9:00pm; Wed: 7:00am-9:00pm; Thu: 7:00am-9:00pm; Fri: 7:00am-9:00pm; Sat: 7:00am-9:00pm; Sun: 7:00am-9:00pm
Pricing
—

Finding this location

  • North East corner of the building

    Source · NREL

Stations & ports

1 station · 2 ports
CCD CHARGING GVR · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4856 Andes Ct · Denver, CO · 80249

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CCD CHARGING GVR located?
CCD CHARGING GVR is located at 4856 Andes Ct, Denver, CO.
What kind of charging does CCD CHARGING GVR offer?
CCD CHARGING GVR offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at CCD CHARGING GVR?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at CCD CHARGING GVR. Actual times vary with vehicle, temperature, and station load.
What are CCD CHARGING GVR's charging hours?
Mon: 7:00am-9:00pm; Tue: 7:00am-9:00pm; Wed: 7:00am-9:00pm; Thu: 7:00am-9:00pm; Fri: 7:00am-9:00pm; Sat: 7:00am-9:00pm; Sun: 7:00am-9:00pm
What charging network operates CCD CHARGING GVR?
CCD CHARGING GVR is part of the ChargePoint network. See more ChargePoint charging across CO on SpotCharge.
Can anyone use the chargers at CCD CHARGING GVR?
Yes — CCD CHARGING GVR is a publicly accessible charging location.
Is the CCD CHARGING GVR listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
23.4
7,502 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 7,502 publicly-listed ports in Colorado (4,774 Level 2 and 2,728 DC fast), that works out to roughly 23.4 EVs per public port and 46.6 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Denver

See all →

Drake Tower Partners - Tesla Supercharger

Denver, CO

DC FastTesla
1 station · 8 ports250 kW

IONNA @ Circle K - Denver

Denver, CO

DC FastIONNA
2 stations · 6 ports400 kW

Denver, CO Rechargery Relay @ Circle K - Tower Road and 67th Avenue

Denver, CO

DC FastIONNA
2 stations · 6 ports400 kW

OUTLOOK HORIZON BLD6-4

Denver, CO

Level 2ChargePoint
1 station · 1 port7.7 kW
Details
Hours
Mon: 7:00am-9:00pm; Tue: 7:00am-9:00pm; Wed: 7:00am-9:00pm; Thu: 7:00am-9:00pm; Fri: 7:00am-9:00pm; Sat: 7:00am-9:00pm; Sun: 7:00am-9:00pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id257092
zip80249
cityDenver
plus4—
stateCO
ng_psi—
cng_psi—
countryUS
latitude39.78498
bd_blends—
longitude-104.766953
open_date2023-03-25
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-17T02:14:33Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCCD CHARGING GVR
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "22878971",
    "22878981"
  ],
  "station": [
    "USCPIL13505511"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address4856 Andes Ct
funding_sources—
owner_type_code—
access_days_timeMon: 7:00am-9:00pm; Tue: 7:00am-9:00pm; Wed: 7:00am-9:00pm; Thu: 7:00am-9:00pm; Fri: 7:00am-9:00pm; Sat: 7:00am-9:00pm; Sun: 7:00am-9:00pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-17
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsNorth East corner of the building
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging