SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoAurora
CO-064147

PARKSIDE AURORA GROUND STA1

14565 E Alameda Ave, Aurora, CO, 80012
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
PARKSIDE AURORA GROUND STA1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

14565 E Alameda Ave · Aurora, CO · 80012

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PARKSIDE AURORA GROUND STA1 located?
PARKSIDE AURORA GROUND STA1 is located at 14565 E Alameda Ave, Aurora, CO.
What kind of charging does PARKSIDE AURORA GROUND STA1 offer?
PARKSIDE AURORA GROUND STA1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at PARKSIDE AURORA GROUND STA1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at PARKSIDE AURORA GROUND STA1. Actual times vary with vehicle, temperature, and station load.
What are PARKSIDE AURORA GROUND STA1's charging hours?
Open 24 hours
What charging network operates PARKSIDE AURORA GROUND STA1?
PARKSIDE AURORA GROUND STA1 is part of the ChargePoint Network network. See more ChargePoint Network charging across CO on SpotCharge.
Can anyone use the chargers at PARKSIDE AURORA GROUND STA1?
Yes — PARKSIDE AURORA GROUND STA1 is a publicly accessible charging location.
Is the PARKSIDE AURORA GROUND STA1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
26.3
6,678 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 6,678 publicly-listed ports in Colorado (4,312 Level 2 and 2,366 DC fast), that works out to roughly 26.3 EVs per public port and 53.7 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Aurora

See all →

Starbucks - Tesla Supercharger

Aurora, CO

DC FastTesla
2 stations · 16 ports50 kW

LEPRINO LEPRINO L4-2

Aurora, CO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

LEPRINO LEPRINO L3-1

Aurora, CO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

LOS ALTOS APTS PEDESTAL 3

Aurora, CO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging