SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsColoradoDivide
CO-019651

Mueller State park

21045 CO-67, Divide, CO, 80814
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Mueller State park · L2 J1772
RIVIAN_WAYPOINTS
AC L2 · 7.2 kW
Start session on RIVIAN_WAYPOINTS network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

21045 CO-67 · Divide, CO · 80814

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Mueller State park located?
Mueller State park is located at 21045 CO-67, Divide, CO.
What kind of charging does Mueller State park offer?
Mueller State park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Mueller State park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Mueller State park. Actual times vary with vehicle, temperature, and station load.
What are Mueller State park's charging hours?
Open 24 hours
What charging network operates Mueller State park?
Mueller State park is part of the RIVIAN_WAYPOINTS network. See more RIVIAN_WAYPOINTS charging across CO on SpotCharge.
Can anyone use the chargers at Mueller State park?
Yes — Mueller State park is a publicly accessible charging location.
Is the Mueller State park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Colorado · 2024
Plug-in vehicles
176K
#7 in US
Battery-electric
127K
72% of fleet
EVs per public port
26.3
6,678 ports listed

As of 2024, Colorado had 175,700 plug-in vehicles registered — 127,000 fully battery-electric (72%) and 48,700 plug-in hybrid (28%). That ranks Colorado #7 nationally and represents about 2.9% of all US plug-in registrations.

Across 6,678 publicly-listed ports in Colorado (4,312 Level 2 and 2,366 DC fast), that works out to roughly 26.3 EVs per public port and 53.7 BEVs per DC fast port.

Colorado's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Colorado market data →

More charging in Divide

See all →

ALOHA DIVIDE I CHARGE YOU

Divide, CO

DC FastChargePoint Network
2 stations · 2 ports50 kW

PIKES PK CHARGE BA.CA.MI LLC #1

Divide, CO

DC FastChargePoint
2 stations · 4 ports62.5 kW
Details
Hours
Open 24 hours
Phone
866-576-1495
Network
RIVIAN_WAYPOINTS ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging